PLAN HEAD - 3600 ( OEW / TrD WORKS )
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,LB, prog
DRM) '22 2022- date Rly of Rly
2023 portion
148 1 11.03.36.17. 36 2017- LB- Hyderabad Division - Replacement of over aged/ DRF 4565 3380 0 3380 31/03/ Det. Est. 90 Work completed,Final payments to be done. PHC
Sanc.
3.52.001 2018 606 defective pumps with energy efficient pump sets 2023 (FuP)
and accessories on energy conservation measures
149 2 11.03.36.18. 36 2018- LB- HYB divn- Provision of smart meters at service DF(3) 17431 10492 5846 16338 31/03/ RE 90 Work is completed, CR drawn and sent to accounts FCC
3.52.002 2019 619 buildings and staff quarters, energy efficient ACs, 2023 (ExcessIn for vetting. (Del)
CostSanc)
occupancy sensors etc in service building. .
150 3 11.03.36.18. 36 2018- LB- Hyderabad Division: Provision of VCBs and RMUs DF(3) 16956 15168 3960 19128 31/03/ RE under 80 Work is completed and can be deleted. FCC
3.52.003 2019 618 in HT power supply with SCADA system 2023 prep. (Del)
151 4 11.03.36.19. 36 2019- - Hyderabad Division: Replacement of lift No.1&2 at DRF 7599 3188 0 3188 31/03/ RE 60 Work in progress. Final payments to be done. FCC
4.52.001 2020 Rail Nilayam 2023 (ExcessIn (Del)
CostSanc)
.
152 5 11.03.36.21. 36 2021- LB- Repl. of defective 11KV HT XLPE UG cable of 3 RRSK 8912 0 0 0 31/03/ Det. Est. 0 Work in progress- TDC 31/03/2023. WIP
3.52.001 2022 639 c185 Sq.mm at LGDS ground, PRS F cable from 2023 Sanc.
n
a
0
d
1
t
p
H
,
e
F
n
o
e
g
a
5
0
S
F
S
E
S
L
B
BGD ELS ground, Hpt Fe, and 1005 SS F on age
D
G
d
n
,
r
g
u
o
cum condition
153 6 11.03.36.21. 36 2021- LB- HYB Divn: Upgradation of 15 Nos. 4 pole D.P Cap. 13615 0 0 0 20/04/ Det. Est. 0 Work in progress. WIP
3.52.002 2022 643 structure to 3 way RMU type at various substations 2023 Sanc.
of HYB divn as a reliability improvement measure.
154 7 11.03.36.21. 36 2021- LB- HYB Div: Prov. of BLDC / SPV fed fans system and DF(3) 4000 0 0 0 31/03/ Det. Est. 0 Work in progress. WIP
Sanc.
3.52.003 2022 637 other energy efficient electrical equipt in service 2023
bldg Quarters and stations.
155 8 11.03.36.21. 36 2021- LB- Replacement of 3 nos of 11KV/433V TF 63-100KVA RRSK 7119 1 0 1 31/03/ Det. Est. 0 Work in progress. WIP
3.52.004 2022 638 with 100KVA at TRNK, & Alugadda bavi, 6 Nos TF 2023 Sanc.
from 250KVA to 500KVA at ORH, ROC and 1005 SS
156 9 11.03.36.21. 36 2021- LB- Upgradation of 33/11KV SS with energy efficient Cap. 0 0 0 0 31/03/ DE under 0 Work in progress, LOA issued on 25/11/2022 for WIP
3.52.005 2022 641 TF and MP based switchgear and RMUs at BGD 2023 prep. Rs.24262499.33
and TRNK SS as a reliability improvement measure.
.
157 10 11.03.36.21. 36 2021- LB- Upgradation of 11KV/433 SS with energy efficient Cap. 4645 0 0 0 21/04/ Det. Est. 0 Work in progress. WIP
3.52.006 2022 642 TF MP based switchgear and RMUs at BGD colony 2023 Sanc.
as a reliability improvement measure.