PLAN HEAD - 4200 ( WORKSHOPS )
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,L '22 2022- date Rly prog
B,DR 2023 portion of
172 1 11.03.42.12. 42 2012- LB- Hyderabad Division-CWM/LGDS - Provision of 450 DF(3),R 3942 2776 0 2776 31/03/ Det. Est. 0 PVC bill for an amount of Rs.3.67 Lakhs sent to WIP
Sanc.
3.52.004 2013 689 KL GLR & Pumping facility for fire fighting RSK 2023 Accounts for payment. Accounts department
returned the PVC bill with some observations.
Remarks to the observations are under preparation.
173 2 11.03.42.17. 42 2017- PB- Kacheguda - Relocation of IOH shed for Cap.,E 122397 92888 1945 94833 31/03/ RE 94 Work completed and deleted from pink book. TDC FCC
1.52.001 2018 623 decongesting coaching complex BR(S) 2023 (ExcessIn 31/03/2023 (Del)
CostSanc)
.
174 3 11.03.42.18. 42 2018- PB- Moula Ali - Upgradation / repl of stationary flash RRSK,E 77094 42242 2319 44561 31/03/ Det. Est. 60 This work consists of 3 Civil sub works costs: 4.56 WIP
1.52.001 2019 643 butt welding plant BR(S) 2023 Sanc. Cr and one Elec. Sub work cost: 2.62Cr Civil sub
works:
1) Laying of Addl. two lines: The contract foreclosed
on during the month of Aug-2020 due to paucity of
funds.
2) Provision of Addl. 8 gantries: Work completed and
FCC passed on 17.03.21
a
o
r
d
:
B
p
r
p
A
h
c
o
a
T
l
5
d
0
a
6
i
a
o
r
d
n
o
f
)
L
3
3) Laying of Approach road: BT road laid on 560m
m
a
g
o
y
i
n
length(road-4 side) and earthwork in progress on
150m length(road-1 side); overall about 70% of the
physical work was completed. Work in progress.
175 4 11.03.42.18. 42 2018- LB- Renovating spring painting facilities and RRSK 22594 0 0 0 31/03/ Det. Est. 0 Revised BQ obtained from M/s KSW and same is WIP
Sanc.
3.52.010 2019 682 Mechanized handling in spring shop at CWS/LGD 2023 under Scrutiny
176 5 11.03.42.19. 42 2019- LB- Integrated Bogie Assembly and Dis-assembly for Cap. 153984 0 0 0 31/03/ Det. Est. 0 As advised by COFMOW, revised specification, flow WIP
Sanc.
1.52.001 2020 710 LGD shops 2023 charts and essentiality submitted to COFMOW for
further process.
- Draft specifications received from COFMOW has
resubmitted duly incorporating required corrections.
Tender floated on 04.05.2022. At present, Tender is
under technical evaluation.
177 6 11.03.42.19. 42 2019- LB- Hyderabad Division - Extension of existing two DF(3) 11811 0 0 0 31/08/ RE under 10 Work in progress. Funds to a tune of Rs. 60 Lakhs WIP
prep.
3.52.001 2020 694 washing lines along with catwalk by 40 meters 2023 are required. TDC 31/08/2023
towards KZJ end to accommodate 12 car MMTS
rake.
178 7 11.03.42.19. 42 2019- LB- Hyderabad-Construction of Pit line for ART& MRV Cap. 14722 6293 4776 11069 31/03/ Det. Est. 90 Civil 90% work has been completed. WIP
Sanc.
3.52.002 2020 695 at Nizamabad 2023 Electrical work is under progress.
Mechanical-Work completed.