PLAN HEAD - 3300 ( S & T WORKS )
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,LB, prog
DRM) '22 2022- date Rly of Rly
2023 portion
143 1 11.03.33.19. 33 2019- PB- Secunderabad - Repl of main ISDN exchange at Rail RRSK,E 38324 20324 5611 25935 31/03/ RE under 94 Work nearing completion. TDC:31/12/2022.LOA WIP
prep.
1.52.001 2020 584 Nilayam BR(S) 2023 issued on 01.04.2021.
144 2 11.03.33.21. 33 2021- - HYB Divinnsion-Fibre to Home Project aiming for RRSK 7400 1586 287 1873 31/03/ Det. Est. 58 Trenching, Fibre laying & duct laying WIP
4.52.001 2022 Upgradation of Telecom Network facilities at 2023 Sanc. completed.Termination of OFC cable at indoor and
officers residential colony / Lallaguda (Phase-II) outdoor under process. TDC: 31/03/2023.LOA
issued on 09.03.2022.
145 3 11.03.33.21. 33 2021- - Railnilayam/Secunderabad : Replacement of RRSK 9400 25 20 45 31/12/ Det. Est. 0 Tender opened on 26.09.2022. TC is under process WIP
Sanc.
4.52.002 2022 firewall in Zonal Railnet of South central Railway 2022 at Sr.DMM office for finalisation. TDC: 30.04.2023
146 4 11.03.33.21. 33 2021- - Hyderabad Division-Fibre to Home Project aiming RRSK 9000 0 3345 3345 31/12/ Det. Est. 58 Trenching, Fibre laying & duct laying WIP
Sanc.
4.52.003 2022 for Upgradation of Telecom Network facilities at 2022 completed.Termination of OFC cable at indoor and
officers residential colony / Lallaguda (Phase-I). outdoor under process. TDC: 31/03/2023.LOA
issued on 09.03.22.
147 5 11.03.33.22. 33 2022- - Reliability improvement works of existing old RRSK 0 0 0 31/03/ DE under Work sanctioned under LSWP-22-23.Tender yet to be TT
p
r
e
l
f
i
v
d
B
o
2024
i
i
s
.
0
1
3
3
2
3
0
.
2
e
d
t
o
a
.
C
:
D
T
a
n
h
x
c
g
i
n
e
s
5
2
.
4.52.001 1 2 2023 3 exchanges in Headquarters area, HYB division n 2 0 2 4 prep. p . floated. TDC: 31.03.2023
4
.
2
e
0
0
0
a
r
r
s
e
H
Y
a
,
a
d
e
H
q
t
e
r
u
a