158 11 11.03.36.21. 36 2021- LB- HYB Divn: Upgradation of 11 Nos. 4 pole D.P Cap. 16871 1 0 1 31/03/ Det. Est. 0 Work in progress. WIP
3.52.007 2022 644 structure to 4 way RMU type at various substations 2023 Sanc.
of HYB divn as a reliability improvement measure.
159 12 11.03.36.21. 36 2021- LB- Repl.of 11KV OH HT line with XLPE UG cable of 3 RRSK 5272 0 0 0 31/03/ Det. Est. 0 Work in progress. WIP
3.52.008 2022 640 C120 Sq.mm, of CKL feeder, CKL SS to Shiva 2023 Sanc.
Temples IRISET F, Golf C-Tara on age cum
condition basis.
160 13 11.03.36.21. 36 2021- LB- Upgradation of Pumping System including W/M, DRF 0 0 0 0 31/03/ DE under 0 Detailed Estimate Under sanction. EST
prep.
3.52.009 2022 636 E/M, SCADA and Remote Operation / Monitoring 2023
etc. and Imp in Water pumping & Management
161 14 11.03.36.21. 36 2021- - Hyderabad Division::strengthening of power supply DRF 3339 0 0 0 31/03/ Det. Est. 0 Work in progress. WIP
Sanc.
4.52.001 2022 to officer’s colony, service building and kalarang at 2023
CKL area
162 15 11.03.36.22. 36 2022- - Provision of solar plants (rooftop) of different Cap. 17668 150 150 31/03/ Det. Est. 0 Work in progress. WIP
3.52.001 2023 capacities at 25 Railway stations over HYB division 2023 Sanc.
163 16 11.03.36.22. 36 2022- - Hyderabad division: Strengthening of Pre-cooling DF(3) 0 0 0 31/03/ DE under 0 Tender opening on 06.12.2022. TT
3.52.002 2023 supply arrangements to pit 2,3 &4 at Kacheguda 2024 prep.
164 17 11.03.36.22. 36 2022- - Hyderabad: Replacement of the over aged Main DRF 0 0 0 30/06/ DE under 0 Tender opening on 23.12.2022. TT
3.52.003 2023 distribution board (MDB) with MP based MCCBs at 2023 prep.
ORH/SC, Lekha Bhavan & CKL Substation.
165 18 11.03.36.22. 36 2022- - HYB Division: Improvement of OHE installations Cap. 0 0 0 31/03/ DE under 0 Detailed Estimate Under Preparation EST
3.52.004 2023 assets over HYB division 2024 prep.
166 19 11.03.36.22. 36 2022- - HYB Division: Upgradation of existing 105 sq.mm Cap. 0 0 0 31/03/ DE under 0 Detailed estimate Under Preparation EST
3.52.005 2023 jumper wire with 160 sq.mm jumper wire to suit 2024 prep.
160 kmph.
167 20 11.03.36.22. 36 2022- - Augmentation of traction power supply Cap. 0 0 0 31/03/ DE under 0 Detailed Estimate Under preparation EST
3.52.006 2023 infrastructure over HYB Division. 2024 prep.
168 21 11.03.36.22. 36 2022- - HYB Division : Replacement of masts with less Cap. 0 0 0 31/03/ DE under 0 Detailed Estimate under Preparation EST