179 8 11.03.42.19. 42 2019- LB- MLY - Installation and commissioning of Cap. 21514 0 0 0 31/03/ Det. Est. 0 P.O placed by COFMOW on M/s Oriental enterprises. WIP
3.52.003 2020 711 Automatic Coach washing plant at ECS/MLY 2023 Sanc. M/s Oriental has agreed to provide a plant suitable
for both stocks. Letter is written to firm for
submission of GAD and CME/PLG office to remaind
the firm.
180 9 11.03.42.19. 42 2019- LB- Hyderabad Division -ECS/MLY: Creation of Cap. 0 0 176 176 31/03/ DE under The competent authority has accorded sanction to WIP
prep.
3.52.004 2020 713 Maintenance facilities for homing of three phase 2023 the Detailed estimate for the subject work
EMUs under MMTS phase-II amounting to Rs. 1,96,20,665/- as below. i) M&P and
T&P cost Rs. 1,68,02,796.00 ii) Civil Engg. cost Rs.
15,16,885.00 iii) Electrical (G) cost Rs. 8,01,003.00 iv)
S&T cost Rs. 4,99,981.00 Total Rs. 1,96,20,665.00
Out of 38 items of M&P and T&P, 21 indents were
placed by stores for which 9 PO was released and 3
items of material were received and 9 indents are
under process.
181 10 11.03.42.21. 42 2021- LB- Provision of OHE line at CWS/LGDS Cap. 0 0 4965 4965 31/03/ DE under 0 Detailed Estimate Under Preparation. EST
prep.
3.52.001 2022 687 2023
182 11 11.03.42.21. 42 2021- LB- Hyderabad~~Improvements/Repairs/renovations Cap.,D 24069 0 0 0 31/03/ Det. Est. 0 Work is in Progress. TDC 31/03/2023 WIP
Sanc.
3.52.002 2022 728 of roofs, , drainages, sheds, roads and toilets in S&T RF 2023
workshops, Mettuguda
183 12 11.03.42.21. 42 2021- - CWS/LGD - Flooring at Tracks besides DHMU shed Cap. 0 0 0 0 31/03/ DE under 0 Detailed Estimate is under finance vetting. EST
prep.
4.52.001 2022 150M X 9.70M 2023
184 13 11.03.42.21. 42 2021- - DLS/MLY - Provision of OHE arrangements for Cap. 0 0 0 0 31/03/ DE under 0 Detailed Estimate Under Preparation. TDC EST
4.52.002 2022 DEMU Pit line-1 at Diesel Loco Shed, Moula-ali. 2023 prep. 31/03/2023
185 14 11.03.42.21. 42 2021- - Renovation of Old LR bays, Drainage System, RRSK 6383 0 0 0 31/03/ Det. Est. 0 Tender Awarded. Work to be Started. TDC WIP
Sanc.
4.52.003 2022 Flooring and Service Building with miscellaneous 2023 31/03/2023
works at Diesel Loco shed , Moula-Ali
186 15 11.03.42.22. 42 2022- - HYB Division-Development of infrastructure Cap. 0 0 0 31/03/ DE under 0 Detailed estimate is under preparation EST
prep.
4.52.001 2023 facilities for maintenance of Vande Bharat Train at 2023
pit line no.3 at kacheguda depot.
187 16 11.03.42.22. 42 2022- KCG depot : Provision of 750 V power supply for Cap. 0 0 0 0 Detailed estimate is under preparation EST