Page 64 - GM's Annual Inspection Booklet DEC- 2022
P. 64
Divitipalli (Pt.No.105B&102B), Poodoor(Pt.No.7B&13B), Mirzapalli (Pt.No.8B,13B &
14B), Gadwal (Pt.No.11B,12B,19B & 20B), Kacheguda (Pt.No.14A,15B&17B)
Talamadla (Pt.No.7B& 13B) and Mirzapalli (Pt.No.7B).
4. Gate holding arrangements for LC gates located between LSS & Home signal provided
at 12 LC gates: 196 atDichpalli, 198at Indalvai,180at Dharmabad,18JBat Bodhan, 155
at Veldurthi, 98 at Gadwal, 138at Dupadu, 73 at Devarakadra, LC gates: 165 at Umri,
198 at Dichpalli, 209A at Kamareddy, 155 at Veldurthi. With these all the identified 12
LC gates in the division completed.
5. In connection with Railway Electrification works, the following works commissioned by
RE/SC organization:
a. Energisation of conventional OHE with 25KVA carried out between
Manoharabad - Kamareddisection on 27.10.22 and Mahabubnagar-Gadwal
section on 27.11.22.
b. Existing PTJ single line tokenless block instruments replaced with UFSBI of
M/s Deltron make and HASSDAC of M/s GGtronics make in the above
sections.(Total 12 block sections)
6. Commissioned provision of sequential Route release of UP & Dn calling on signals
S40A and S1A.
62