Page 69 - GM's Annual Inspection Booklet DEC- 2022
P. 69
4. SCTR of two coaches per rake during every primary attention is carried out using the
compressed air pipeline laid underneath the catwalk between pitline 2 & 3 to detect
defective DVs in advance.
5. Inaugural run of Train no. 07577/78 (MDAK-KCG) done on 23.09.2022.
6. Other end maintenance of two trains having train no.07584/88 and 07577/78 has been
started at Medak station from 23.09.2022.
7. All primary maintained trains of KCG depot are provided with bedroll services.
67