iii.   Provision of Exhaust system at Fuel Injectors & pumps overhauling
                          Room














                                      Provided exhaust system at FIP Room


                               During  the  overhauling  of  Fuel  injectors  and  pumps  fumes  of  HSD  oil  are
            generated which are harmful, if inhaled. An exhaust system was designed and fabricated for
            expelling  these fumes  at  a cost of INR  32,000/-  enabling  the  staff  to  work  in  a fume-free
            environment apart from improvement in fire safety.

                    iv.   Inauguration of Electric Steam Boiler: PCEE/SCR inaugurated the Electric
                          Steam Boiler of 20KW capacity with a storage capacity of 25 litres and rated
                                                2
                          pressure of 6 kg/cm  and also witnessed the blowing of radiators on loco with
                          generated steam.















                     v.   Inauguration of the Indigenously developed Radiator in-situ cleaning and
                          testing  equipment:  PCEE/SCR  inaugurated  the  indigenously  developed
                          Radiator in-situ cleaning and testing equipment which was developed in-house
                          by  the  shed  staff  for  in-situ  internal  cleaning  of  the  Radiator  cores  of  the
                          locomotives.














                    vi.   Inauguration of the Women
                          PCEE/SCR inaugurated the Women employees section which was formulated
                          to commemorate Nari Shakti. The section looks after overhauling of electrical
                          and mechanical auxiliaries.