Page 6 - diesel shed.pdf
P. 6
iii. Provision of Exhaust system at Fuel Injectors & pumps overhauling
Room
Provided exhaust system at FIP Room
During the overhauling of Fuel injectors and pumps fumes of HSD oil are
generated which are harmful, if inhaled. An exhaust system was designed and fabricated for
expelling these fumes at a cost of INR 32,000/- enabling the staff to work in a fume-free
environment apart from improvement in fire safety.
iv. Inauguration of Electric Steam Boiler: PCEE/SCR inaugurated the Electric
Steam Boiler of 20KW capacity with a storage capacity of 25 litres and rated
2
pressure of 6 kg/cm and also witnessed the blowing of radiators on loco with
generated steam.
v. Inauguration of the Indigenously developed Radiator in-situ cleaning and
testing equipment: PCEE/SCR inaugurated the indigenously developed
Radiator in-situ cleaning and testing equipment which was developed in-house
by the shed staff for in-situ internal cleaning of the Radiator cores of the
locomotives.
vi. Inauguration of the Women
PCEE/SCR inaugurated the Women employees section which was formulated
to commemorate Nari Shakti. The section looks after overhauling of electrical
and mechanical auxiliaries.
Page 6 of 14