Page 30 - OPERATING
P. 30

NEW WORKS PROPOSED UNDER PWP 2021-22:
                                                                                                    (Rs. in 000‟)
             Sl.          Description of work                  Cost                        Status
             No
             1.  Kacheguda: Extension of shunting            34,19,58     Proposal has been shortlisted by
                  neck from existing 526 mts to 730                       Hqrs and sent to Railway board.
                  mts duly constructing bridge on
                  Moosi River.
             2.  Dupadu: Provision of Standard               9,70,00      Proposal has been shortlisted by
                  layout station.                                         Hqrs and sent to Railway board.
             3.  Bolsa: Provision of Standard layout         11,51,28     Proposal has been shortlisted by
                  station.                                                Hqrs and sent to Railway board.
             4.  Bye-pass line between                      138,55,87  Proposal has been turned down by
                  Sitaphalmandi-Malkajgiri.                               Hqrs.



            NEW WORKS YET TO BE PROPOSED UNDER PWP 2022-23:

             Sl.
             No               Description of work                                       Status
             1.  Kachiguda: Increasing the CSRs of Rd no.3  The work proposed under PWP 2022-23
                  (610 mtrs), Rd no.4 (579 mtrs) and Rd no.5  Necessary estimates along with sketches
                  (544 mtrs) to accomodate full length trains.     to be prepared and submitted by
             2.  Dichapalli: Provision of an additional loop       concerned departments.
                  line at Dichpalli for dealing goods loading      Note Submitted to concerned Departments.
                  and unloading activities.



            SANCTIONED WORKS

            LUMPSUM WORKS PROGRAMME (LSWP)
                                                                                            (Rs. in 000‟)
                                                          Latest
                   Description of          Year of
            SNo                                        Anticipate Remarks /Present status
                   work                    Sanction
                                                          d Cost
           1.      Kacheguda:             2014-15         99,42      Work in progress, track linking completed.
                   Provision of                                      Line  will  be  connected  along  with  KCG
                   additional Stabling                               Yard  Modification  for  IOH  Shed.  SIP
                   line                                              approved  for  shifting  (Revision)  of  shunt
                                                                     permit  indicators  for  IOH  shed  work  at
                                                                     KCG  and  it  involves  shifting  of  OHE
                                                                     portal. TDC-31.07.2021













                                                                                                    Page 30 of  35
   25   26   27   28   29   30   31   32   33   34   35