9. Special Achievements made in Track and Bridge works.

                 Progress of Deep Screening of Plain Track with BCM machine for the year 2020-
                   21 up to Feb-21 is 76 Km.

               i.  During the shadow block of 64 Hrs at Br No: 74 on SC-DHNE section, the Work of
                   Deep Screening with BCM machine has been carried out between stations KCG-FM
                   (DN Line) on SC-DHNE section and a progress of 2.590 Km has been achieved for
                   three days(16.05.20 = 1.260 Km, 17.05.20 = 0.820 Km and 18.05.20 = .510 Km)

               ii.  On 27.12.2020, Division has achieved a progress of 2.700 Km of Deep Screening
                   with BCM machine on a single day (02 Machines), BCM 290 has achieved 1.200  Km
                   and BCM 394 has achieved 1.500 Km. The progress of 2.700 Km in a single day is
                   the best ever progress achieved in the Division.

               iii.  BCM  290  machine,  which  is  working  in  the  Division  is  a  30  Yrs  old  machine.  The
                   progress achieved by the machine is about 67 Km in 10 Months, which is the highest
                   ever progress in the History of working of BCM-290 machine.

               iv.  During  lockdown  period,  when  passenger  carrying  train  traffic  was  less,  the
                   opportunity of traffic blocks was utilized and long pending work of Deep Screening in
                   suburban section i.e SC-FM and SC-BMO sections was taken up and completed.


                 Rebuilding of Br no: 74 on SC-DHNE section –

            The work of Rebuilding of Br No: 74 in UR yard on SC-DHNE section has been taken up
            duly taking a mega block of 64 Hrs i.e from 08.00 Hrs of 16.05.20 to 00.00 Hrs of 19.05.20.
            (This work is executed by RVNL as a part of Doubling of SC-MBNR section)























                                                              Rebuilding of Bridge no. 74 in UR yard.

            Note: This work has resulted in saving of Rs 10 Crores to  Railways, as it is
                       executed by RVNL as a part of SC- MBNR doubling work.