  Rebuilding of existing stone top culvert Bridge No: 197 with RCC boxes between
                   GLY-JCL  stations  on  SC-DHNE  section  has  been  taken  up  and  completed  in  the
                   shadow of mega block at Br No: 74 on 17.05.20.






















                 Rebuilding of Br no: 109 & 196 has also been completed as a part of Doubling of
                   SC-MBNR section by RVNL.


            10. The Division has Received Efficiency Shields for Elimination of Level crossing
                  and Transformation shield for the year 2019-20 on 30.12.2021.
















                       (Receiving efficiency shield as Best Division for Elimination of Level Crossings)



            11. Inauguration of Zonal Track Machine Depot (ZTMD) at Cavalry Barracks Station by
                  Additional Member (Civil Engineering) / Railway Board on 20.02.2021.

               Adhering  to  the  instructions  of  Railway  Board  for  transforming  the  conventional
            maintenance  of  track  into  mechanized  maintenance,  HYB  Division  took  a  step  forward  in
            creating  necessary  infrastructure  (ZTMD)  at  Cavalry  Barracks  for  housing  sophisticated
            track machines like BCM, SBCM/FRM, Unimat, CSM, Duomatic, BRM, UTV, and DGS.

            Some of the key features of this noteworthy asset are detailed as under


                 Shed/Depot housing two tracks of size 42mx20.5m.
                 Service building in an area of about 700 Sq.m
                 A separate block has been provided which accommodates Rest rooms for Staff  with
                   Kitchen, Dining and Toilet facilities
                 A block for storing heavy duty machines like cutter chains, cutter bars, BCM and FRM
                   in an area of about 315 Sq.m