Chapter  5     CONSTRUCTION             257















                                                                                               Chapter

                                 CONSTRUCTION  5














                                                                       Introduction






                       The method of managing and conducting on-site construction will vary greatly, due to
               project size, complexity and scope of work.  The information outlined herein is a basic and
               practical system presently used by many Design-Builders.  The Site Supervisor and Project
               Manager should be aware of the absence of any control by a third party agent and therefore
               recognize the importance of mandatory testing and inspections including the local building
               officials and retained design-professionals.
                       The construction budget, schedule and subcontractors will present daily challenges and
               without a system of control and supervision the desired results will not be obtained. Ensure that
               complete drawing,  specifications and all necessary approvals and permits are obtained prior to
               commencing on-site work. Responding to critical site matters on a timely and effective manner
               will ensure the completion of your Design-Build construction projects, "on time and on budget."