Page 31 - PPO Diaries
P. 31

PPO Diaries


                                                      ❖ A brief overview of the project

                                                      I was initially briefed that I would have to do two projects. Later
                                                            rd
                                                      on a 3  project was added. They were
                                                              1.  Resolution on stockouts due to multiple codes - A
                                                                 recommendation tool to place stockout orders in
                                                                 equivalent product codes where stock is available at
                                                                 pan India level
                                                              2.  Restructuring & implementing cold chain
                                                                 transportation in -20 °C - Setting up process/
                                                                 framework for -20 °C transportation and associated
                                                                 logistics.
       .
                                                      Feasibility analysis of a Super Distributor at Ranchi -
                 DALE MATHEWS
                                                      Recommendation to go ahead with Ranchi Super Distributor or
                      ABBOTT                          Patna C&FA.

       __________________________________________


         GENERAL INFORMATION                          ❖ How is a normal day at the Internship?


          Batch: PGDIM 25                             My office was at BKC. I used to start along with my fellow
                                                      interns around 7-7:15am. The commute used to take about 45
          BTech: SSN College of                       mins. After breakfast at office I would get down to work from
                                                      8:30 – 8:45am. My manager used to arrive at 9:30am. I used to
                        Engineering                   outline my work for the day and frame questions that I needed
                                                      clarifications on till he arrived. Once he arrived, I would clear
          Stream: ECE
                                                      my doubts and fix meetings with him, and others based on
                                                      needs. I would do my work with 1 or 2 coffee breaks in
          Work Ex: Mu Sigma
                                                      between. I used to go for lunch with my fellow interns who

      were on the same floor at about 1:30pm. Post lunch I would either meet my guide or others from whom I had to
      gather information. I would also show my work up until then in the post lunch meetings. Post the meetings I

      would work on the new data/ information received and improvements/ changes suggested with a coffee break in

      between. Most of the interns were directed to leave by 5-5:30pm. My day would end at 5pm - 5:15pm max as my

      manager had especially directed me not to stay beyond 5:30pm.


      ❖ What are the challenges faced during Internship?

      The main challenge was availability of people. As everyone is busy with their day to day tasks it is difficult to get

      their time. Sometimes needs do arise for clarifications from certain people who are either on leave or working in

      the field. Coordinating the availability of various people for various information need was difficult.