                                                      ❖ A brief overview of the project
                                                          Project 1 – To analyse and find out if replacing the current
                                                          commercial vehicles used in secondary transportation
                                                          system of Dabur India Ltd. by Electric Vehicles can yield any
                                                          tangible benefit in monetary/non-monetary terms
                                                          Project 2 – To analyse and find out if a super stockist model
                                                          can be introduced in the existing secondary distribution
                                                          system leading to improvement in service levels

                                                      ❖ How is a normal day at the Internship?
                                                          On my first day itself at Dabur, I was handed over 2 projects
                                                          which were crucial for the management, and I was expected

                                                          to  exceed  the  expectations  of  my  superiors.  Each  day
                  NILAY PANDAY                            brought a new set of challenges, and I can hardly remember

                      DABUR                               a time when I wasn’t working on something new. From the
                                                          first  week  itself,  I  was  setting  up  meetings  and  attending
       __________________________________________         conference calls with consulting giants of EV industry, then I

         GENERAL INFORMATION                              was  on  field  exploring  warehouses  and  benchmarking
                                                          distribution  system  and  next  I  knew,  I  was  handed  over
           Batch: PGDIM 25                                another assignment to finish within the same deadline. No
                                                          two  days  were  similar,  and  hence  it  is  hard  to  say  how  a
           BTech: NIT, Raipur                             “Normal” day went.

           Stream: Mechanical

           Work Ex: Tata Motors



       ❖ What are the challenges faced during Internship?

          Wherever you go, you are sure to face a lot of challenges – some of them trivial, some of them major. But
          one major challenge which I’m sure each one of you would be facing is to convince people around you
          that what you’re doing is right (when you’re right). Not everyone in the industry is welcome to changes –
          because Newton’s law of inertia works on its full strength there. So to drive any minor change, it requires
          a lot of determination and persuasion. Solving a problem would always be easy for you, given your
          academic background. But the real challenge lies in scaling the solution & its implementation.



       ❖ What did you do right and what did you do wrong?
          What did I do right: To be very honest, I still do not know what exactly went right and I won’t be sure of it
          even after pondering on it for long. But I think some traits which might have helped are:
          i) Flexibility to change – when faced with a challenge which requires to rethink your approach





       67 | P a g e                                                                                                                                               T a t v a   1 2