risk management during and after
                                                                             the construction etc. The building
                                                                             positioning, landscaping, façade
                                                                             designing also have an environmental
                                                                             aspect to keep in mind. Usage of
                                                                             maximum natural lights, corridors with
                                                                             lesser turns, elevators/ staircase at right
                                                                             position, access control facilities, air
                                                                             changes/ pressures/ filtrations in OT and
                                                                             critical care areas are some indicators
                                                                             of a good design. The commissioning
                                                                             process further requires manpower and
                                                                             equipment estimation, defined hiring
                                                                             process with pre-decision evaluation,
                                                                             licensing, identifying and implementing
         Understanding                     Design &                          defined operational policies (preferably in
                                                                             line of NABH / JCI) etc.
         Viability                         Construction
                                                                             Commissioning
         Ensuring correct work in place demands   A space programming followed by
         planning for the same much before the   Architectural brief, layout and site plan
         facility starts its operation. It actually   with landscaping is primarily done   Commissioning process is very complex
         begins from the feasibility analysis. A   to start the designing work. Working   and involves the following multiple
         detailed study includes location analysis,   drawings are made by different engineers   parallel activities to carry out with
         understanding the socio economic status   for electrical, civil / structural, MEP   accuracy & timeliness. A commissioning
         of the area, the disease profile, health   & HVAC services. Finally, all designs   calendar is a useful tool to keep the
         indicator status, paying capacity & habit,   are amalgamated into one and we   timeliness in track. The same should have
         local competition / trend and a site   get master drawing for construction.   all parallel activities and completion time
         analysis (soil analysis, bore water level,   Interiors are preferably done for medical   mentioned.
         area altitude & land height, earthquake   and nonmedical areas with a different   •   Licensing
         zone etc.) and the finances. A good   approach.
         planning team not only takes care of                                •   Equipment and furniture planning
         technical aspect of feasibility but the   In best case scenario the team is to   and procurement
         economic viability becomes priority so as   be monitored by a hospital planning   •   Manpower planning and recruitment
         to take care of the stakeholders’ interest   expert with sound knowledge of clinical   •   Tariff and salary structure
         and importantly for debt syndication and   requirement and hospital operations.
         to have an idea on proposed ROI, break   The team must ensure zero rework /   •   SOP formulation
         even etc. After leaving no stone unturned   reconstruction and building meet the   •   MIS development
                                           requirements and standards of regulating
         we reach to the enviable facility mix with
       |   Oc t ober - Dec ember 2 0 19  unbiased outside agency preferably a   etc.).   •   marketing
                                                                                 Brochure designing, launching
                                                                             •
                                           (NBC, Clinical Establishment Act etc) and
         the needed volume. The quality of the
                                                                                 website and pre-inauguration
                                           accreditation organizations (JCI, NABH
         feasibility analysis should be done by an
                                                                                 Soft run
         hospital management consultancy that
                                           An accurate design and layout include
         will not have any pre conceived opinion
                                                                                 Project launch
                                                                             •
                                           design for safety, security, facility
         about the project. Depending upon
                                           design principles, easy functional flow,
         the techno economic feasibility report
                                           infection control guidelines, surge and
         (often known as DPR) banks provide debt
                                           emergency preparedness for effective
         mostly in the range 30% - 60% of the
       88  project cost.                   emergency management, pro-active