Page 5 - COMPREHENSIVE_SITE_ASSESSMENT_REPORT_V1_OF_3_CORE_BUILDINGS_AND_INFRASTRUCTURE18H35
P. 5
HEAD OFFICE |VAT REGISTRATION NUMBER |4960317727 FLEET & EQUIPMENT
PHYSICAL ADDRESS:Ground Floor – Building 2 |NHBRC REGISTRATION NUMBER |4000013824 IN-HOUSE EARTHMOVING FLEET UNITS) INSURANCE
|CIDB GRADING DESIGNATION | GNSS RTK SURVEY EQUIPMENT PUBLIC LIABILITY COVER| R5 MILLION
Gleneagles Park 10Flanders Drive Mount Edgecombe |CSD SUPPLIER NUMBER | SCAFFOLDING & FORMWORK SYSTEMS PROFESSIONAL INDEMNITY| R2MILLION
POSTAL ADDRESS: P.O. Box 582 Westville 3630 TAX CLEARANCE CERTIFICATE |SARS COMPLIANT HUMAN RESOURCES ALL RISK COVER | R10 MILLION
|B-BBEE LEVEL |LEVEL 1 BARGAINING COUNCIL REGISTRATION|BCAWU COMPLIANT BANK DETAILS
TEL: +27 73 557 1040 Fax:
CSD SUPPLIER NUMBER |REGISTERED PERMANENT CREW |TRAINED ARTISANS PERSONNEL ACCOUNT TYPE | BUSINESS CHEQUE ACCOUNT
EMAIL: admin@dsonindustries.co.za MASTER BUILDERS ASSOCIATION |MEMBER QUALIFIED SITE SAFETY OFFICERS --2 |FIRST NATIONAL BANK — ACC NO: 63104084883, |
WEBSITE: www.dsonindustries.co.za CIVIL ENGINEERING & CONSTRUCTION WORKS INHOUSE ENGINEERS AND DRAUGHTSMAN BRANCH WESTVILLE (250655), SWIFT: FIRNZAJJ |
FULL SAFETY COMPLIANCE (ISO 45001/OHS ACT) ACCOUNT TYPE | BUSINESS CHEQUE ACCOUNT
Symptom Primary Understood Operational
Defect Category Affected Locations
Observed Indicator Cause Impact
Reduced
Extended transit Cumulative Production timing,
8. Operational vehicle speeds times, System-wide across
effect of surface equipment 2
Constraints (<5 km/h in 6,000m
avoidance conditions
zones) scheduling
behavior
◄ ►
2
2
Rehabilitation Rate for Consideration: R85.00/m (6,000 m ) = R510,000.00 + VAT
5.2 PHOTOGRAPHIC DOCUMENTATION REFERENCE
The conditions described in Section 5.1 are documented in detail within the Appendices. Representative images illustrate:
APPENDIX A: PHOTOGRAPHIC EVIDENCE
I
• Surface deterioration progression I
• Rutting and wheel track formation I
• Standing water and drainage issues I
• Soft spot locations and bearing I
• Equipment operational challenges
I
[Detailed captions and analysis I
provided in Appendix section]
I
5.3 WESTERN GROWING FACILITIES OBSERVATIONS
Element Condition Observed Location
Stormwater Infrastructure Blockages, overflow points during moderate rainfall Rill Western facilities drainage network
Slope Conditions Gabion erosion on filled slopes, tension cracks Structural Platform perimeters and embankments
Structures Drainage displacement, deterioration Western facilities retaining elements 11
Channels Silt accumulation, reduced capacity primary gutter system connections
◄ ►
◄ ►