Page 5 - COMPREHENSIVE_SITE_ASSESSMENT_REPORT_V1_OF_3_CORE_BUILDINGS_AND_INFRASTRUCTURE18H35
P. 5

HEAD OFFICE                     |VAT REGISTRATION NUMBER          |4960317727  FLEET & EQUIPMENT
                                       PHYSICAL ADDRESS:Ground Floor – Building 2   |NHBRC REGISTRATION NUMBER   |4000013824                                                                               IN-HOUSE EARTHMOVING FLEET UNITS)  INSURANCE
                                                                       |CIDB GRADING DESIGNATION   |   GNSS RTK SURVEY EQUIPMENT  PUBLIC LIABILITY COVER| R5 MILLION
                                       Gleneagles Park 10Flanders Drive Mount Edgecombe  |CSD SUPPLIER NUMBER               |  SCAFFOLDING & FORMWORK SYSTEMS  PROFESSIONAL INDEMNITY| R2MILLION
                                           POSTAL ADDRESS: P.O. Box 582 Westville 3630  TAX CLEARANCE CERTIFICATE    |SARS COMPLIANT    HUMAN RESOURCES   ALL RISK COVER        | R10 MILLION
                                                                       |B-BBEE LEVEL                 |LEVEL 1   BARGAINING COUNCIL REGISTRATION|BCAWU COMPLIANT                      BANK DETAILS
                                           TEL: +27 73 557 1040        Fax:
                                                                       CSD SUPPLIER NUMBER          |REGISTERED  PERMANENT CREW |TRAINED ARTISANS PERSONNEL  ACCOUNT TYPE  | BUSINESS CHEQUE ACCOUNT
                                       EMAIL: admin@dsonindustries.co.za  MASTER BUILDERS ASSOCIATION  |MEMBER  QUALIFIED SITE SAFETY OFFICERS --2  |FIRST NATIONAL BANK — ACC NO: 63104084883, |
                                       WEBSITE: www.dsonindustries.co.za  CIVIL ENGINEERING & CONSTRUCTION WORKS  INHOUSE ENGINEERS AND DRAUGHTSMAN  BRANCH WESTVILLE (250655), SWIFT: FIRNZAJJ |
                                                                                                   FULL SAFETY COMPLIANCE (ISO 45001/OHS ACT)  ACCOUNT TYPE  | BUSINESS CHEQUE ACCOUNT



                                       Symptom           Primary             Understood         Operational
                  Defect Category                                                                                     Affected Locations
                                       Observed          Indicator           Cause              Impact


                                       Reduced
                                                         Extended transit    Cumulative         Production timing,
                  8.  Operational      vehicle speeds    times,                                                       System-wide across
                                                                             effect of surface   equipment                    2
                  Constraints          (<5 km/h in                                                                    6,000m
                                                          avoidance          conditions
                                       zones)                                                   scheduling
                                                         behavior

                 ◄                                                                                                                            ►

                                                                           2
                                                                2
                 Rehabilitation Rate for Consideration: R85.00/m (6,000 m )  = R510,000.00 + VAT





                 5.2 PHOTOGRAPHIC DOCUMENTATION REFERENCE


                 The conditions described in Section 5.1  are documented in detail within the Appendices. Representative images illustrate:









                   APPENDIX A:  PHOTOGRAPHIC EVIDENCE

                                                 I
                    • Surface deterioration progression   I
                    • Rutting and wheel track formation    I
                    • Standing water and drainage issues   I
                    • Soft spot locations and bearing    I
                    • Equipment operational challenges









                                         I
                    [Detailed captions and analysis      I
                    provided in Appendix section]

                                                              I










                 5.3 WESTERN GROWING FACILITIES OBSERVATIONS



                  Element                     Condition Observed                                       Location

                  Stormwater Infrastructure    Blockages, overflow points during moderate rainfall Rill   Western facilities drainage network

                  Slope Conditions Gabion      erosion on filled slopes, tension cracks Structural     Platform perimeters and embankments

                  Structures Drainage          displacement, deterioration                             Western facilities retaining elements 11

                  Channels                     Silt accumulation, reduced capacity                     primary gutter system connections



                 ◄                                                                                                                            ►













                 ◄                                                                                                                            ►
   1   2   3   4   5   6   7   8   9   10