Page 9 - COMPREHENSIVE_SITE_ASSESSMENT_REPORT_V1_OF_3_CORE_BUILDINGS_AND_INFRASTRUCTURE18H35
P. 9
HEAD OFFICE |VAT REGISTRATION NUMBER |4960317727 FLEET & EQUIPMENT
PHYSICAL ADDRESS:Ground Floor – Building 2 |NHBRC REGISTRATION NUMBER |4000013824 IN-HOUSE EARTHMOVING FLEET UNITS) INSURANCE
|CIDB GRADING DESIGNATION | GNSS RTK SURVEY EQUIPMENT PUBLIC LIABILITY COVER| R5 MILLION
Gleneagles Park 10Flanders Drive Mount Edgecombe |CSD SUPPLIER NUMBER | SCAFFOLDING & FORMWORK SYSTEMS PROFESSIONAL INDEMNITY| R2MILLION
POSTAL ADDRESS: P.O. Box 582 Westville 3630 TAX CLEARANCE CERTIFICATE |SARS COMPLIANT HUMAN RESOURCES ALL RISK COVER | R10 MILLION
|B-BBEE LEVEL |LEVEL 1 BARGAINING COUNCIL REGISTRATION|BCAWU COMPLIANT BANK DETAILS
TEL: +27 73 557 1040 Fax:
CSD SUPPLIER NUMBER |REGISTERED PERMANENT CREW |TRAINED ARTISANS PERSONNEL ACCOUNT TYPE | BUSINESS CHEQUE ACCOUNT
EMAIL: admin@dsonindustries.co.za MASTER BUILDERS ASSOCIATION |MEMBER QUALIFIED SITE SAFETY OFFICERS --2 |FIRST NATIONAL BANK — ACC NO: 63104084883, |
WEBSITE: www.dsonindustries.co.za CIVIL ENGINEERING & CONSTRUCTION WORKS INHOUSE ENGINEERS AND DRAUGHTSMAN BRANCH WESTVILLE (250655), SWIFT: FIRNZAJJ |
FULL SAFETY COMPLIANCE (ISO 45001/OHS ACT) ACCOUNT TYPE | BUSINESS CHEQUE ACCOUNT
2
• 6,000 m road rehabilitation addressing heavily trafficked
surfaces
• 134m G8 retaining wall installation
These works could address some of the more prominent surface conditions observed while allowing
evaluation of our technical approach and quality standards.
9.2 ENGAGEMENT SUGGESTION
We would welcome the opportunity to discuss our findings and proposed approach with your team at
your convenience. Understanding that infrastructure decisions involve multiple considerations-
operational, financial, timing, and strategic-we are available to:
• Present our assessment in detail to relevant stakeholders
• Align our approach with your established quality standards and protocols
• Discuss phasing options that minimize operational disruption
• Provide any additional technical information that would assist in your decision-making
We recognise that as year-end approaches, planning for 2026 CAPEX allocations is underway.
Should this proposal align with your infrastructure priorities, we stand ready to support your
planning process.
Proposed Investment Summary:
2
2
• Road Rehabilitation: R510,000.00 (6,000 m @ R85.00/m )
2
2
• GS Retaining Wall: R184,250.00 (147.4 m @ Rl ,250.00/m )
• VAT (15%): Rl04,137.50
• Total: R798,387.50
9.3 QUALITY APPROACH
Should you proceed with these works, we would implement:
• Independent material testing (SAN AS-accredited laboratories)
• Regular density testing using calibrated equipment
• GNSS RTK survey verification (±lOmm precision)
• Photographic progress documentation
• SANS 1200D and SANS 10400-K compliance
• Engineer supervision and certification
• As-built documentation upon completion

