Page 9 - COMPREHENSIVE_SITE_ASSESSMENT_REPORT_V1_OF_3_CORE_BUILDINGS_AND_INFRASTRUCTURE18H35
P. 9

HEAD OFFICE                     |VAT REGISTRATION NUMBER          |4960317727  FLEET & EQUIPMENT
                                       PHYSICAL ADDRESS:Ground Floor – Building 2   |NHBRC REGISTRATION NUMBER   |4000013824                                                                               IN-HOUSE EARTHMOVING FLEET UNITS)  INSURANCE
                                                                       |CIDB GRADING DESIGNATION   |   GNSS RTK SURVEY EQUIPMENT  PUBLIC LIABILITY COVER| R5 MILLION
                                       Gleneagles Park 10Flanders Drive Mount Edgecombe  |CSD SUPPLIER NUMBER               |  SCAFFOLDING & FORMWORK SYSTEMS  PROFESSIONAL INDEMNITY| R2MILLION
                                           POSTAL ADDRESS: P.O. Box 582 Westville 3630  TAX CLEARANCE CERTIFICATE    |SARS COMPLIANT    HUMAN RESOURCES   ALL RISK COVER        | R10 MILLION
                                                                       |B-BBEE LEVEL                 |LEVEL 1   BARGAINING COUNCIL REGISTRATION|BCAWU COMPLIANT                      BANK DETAILS
                                           TEL: +27 73 557 1040        Fax:
                                                                       CSD SUPPLIER NUMBER          |REGISTERED  PERMANENT CREW |TRAINED ARTISANS PERSONNEL  ACCOUNT TYPE  | BUSINESS CHEQUE ACCOUNT
                                       EMAIL: admin@dsonindustries.co.za  MASTER BUILDERS ASSOCIATION  |MEMBER  QUALIFIED SITE SAFETY OFFICERS --2  |FIRST NATIONAL BANK — ACC NO: 63104084883, |
                                       WEBSITE: www.dsonindustries.co.za  CIVIL ENGINEERING & CONSTRUCTION WORKS  INHOUSE ENGINEERS AND DRAUGHTSMAN  BRANCH WESTVILLE (250655), SWIFT: FIRNZAJJ |
                                                                                                   FULL SAFETY COMPLIANCE (ISO 45001/OHS ACT)  ACCOUNT TYPE  | BUSINESS CHEQUE ACCOUNT


                               2
                   • 6,000 m road rehabilitation addressing heavily trafficked
                     surfaces



                   • 134m G8 retaining wall installation
                 These works could address some of the more prominent surface conditions observed while allowing

                 evaluation of our technical approach and quality standards.



                 9.2 ENGAGEMENT SUGGESTION


                 We would welcome the opportunity to discuss our findings and proposed approach with your team at
                 your convenience. Understanding that infrastructure decisions involve multiple considerations-

                 operational, financial, timing, and strategic-we are available to:





                   • Present our assessment in detail to relevant stakeholders


                   • Align our approach with your established quality standards and protocols


                   • Discuss phasing options that minimize operational disruption



                   • Provide any additional technical information that would assist in your decision-making



                 We recognise that as year-end approaches, planning for 2026 CAPEX allocations is underway.

                 Should this proposal align with your infrastructure priorities, we stand ready to support your

                 planning process.


                 Proposed Investment Summary:

                                                                                          2
                                                                         2
                   • Road Rehabilitation: R510,000.00 (6,000 m @ R85.00/m )
                                                                                            2
                                                                       2
                   • GS  Retaining Wall: R184,250.00 (147.4 m @ Rl ,250.00/m )

                   • VAT  (15%): Rl04,137.50


                   • Total: R798,387.50




                 9.3 QUALITY APPROACH


                 Should you proceed with these works, we would implement:



                   • Independent material testing (SAN AS-accredited laboratories)


                   • Regular density testing using calibrated equipment



                   • GNSS RTK survey verification (±lOmm precision)


                   • Photographic progress documentation



                   • SANS  1200D and SANS  10400-K compliance


                   • Engineer supervision and certification


                   • As-built documentation upon completion
   4   5   6   7   8   9   10   11   12   13   14