Page 27 - 11394_AEW_XX_XX_PP_A_0003_CO-OP PRE-CONSTRUCTION MANUAL
P. 27
2
2A.1 Developer led project
RAM
Task SLA Issue Available on Standard form
Method I-Site (/)
Identify marginal site - - -
Stage 0 Communicate marginal site to External Project Manager and provide TCG’s brief and - Email Stage 0 instruction (email form)
requirements for the site
Receive feasibility drawing (and cost appraisal if required) from External Project
Manager - Email Stage 0 Feasibility drawing
Stage 0 Cost Appraisal
Undertake draft Investment Appraisal [IA] following receipt of feasibility drawing (and - - -
cost appraisal if required) to determine if the site should be put forward to LP&P
Task SLA Issue Available on Standard form
Method I-Site (/)
Identify non-marginal site and agree site with LP&P - Email -
Complete draft Investment Appraisal [IA] - - -
Communicate non-marginal site to External Project Manager and provide TCG’s brief - Email Stage 1 instruction (email form)
and requirements for the site
Receive Project Plan from External Project Manager - Email Project Plan (email form)
Stage 1 Receive Stage 1 feasibility drawings and Asset Plan from External Project Manager - - Email Stage 1 Feasibility drawings
Email
RLA Desktop Assessment
Review Stage 1 feasibility drawings and Asset Plan and obtain agreement from
Retail Location Analyst [RLA]
Once agreed with RLA, zonal analysis undertaken and issued to the External Project - Email Zonal Analysis
Manager
Receive Scheme Approval 1 meeting minutes from Internal Project Manager - Email Scheme Approval Minutes
Review Approved Stage 1 information and CV1 Investment Appraisal [IA] Summary - Board Approval CV1 IA Summary
received from Quantity Surveyor during the Scheme Approval 1 meeting and obtain Stage 1 feasibility drawings
approval from Food Property Board [FPB] Asset Plan
Zonal Analysis
Notify External Project Manager to proceed to Stage 2 following Food Property - Email -
Board [FPB] approval
Task SLA Issue Available on Standard form
Method I-Site (/)
Engage solicitors and agree the lease - BlueBox & EAS -
Receive Scheme Approval 2 meeting minutes from Internal Project Manager - Email Scheme Approval Minutes
Receive approved Scheme Approval 2 pack of information and CV2 Investment - Email CV2 IA Summary
Appraisal [IA] Summary from the Quantity Surveyor during Scheme Approval 2 PCSD’s 00-05
meeting
Stage 2 Report
Stage 2 Notified by External Project Manager to proceed with exchange of contracts if Cost - Email -
Validation 2 [CV2] is less than approved CV1
Receive Cost Validation 2 [CV2] from the External Project Manager if CV2 > CV1 - Email Cost Validation [CV2] cost document
Represent at FCEF if CV2 costs exceed +5% of approved CV1 costs, or outside 12 - Email -
months of Board approval date
Escalate to Head of Acquisitions for DAL uplift if CV2 exceeds Board Approval >5% - Email -
of CV1 costs
Notify External Project Manager and proceed to exchange of contracts when CV2 - Email -
costs approved at FCEF or by Head of Acquisitions
Task SLA Issue Available on Standard form
Method I-Site (/)
Attend Exchange Meeting (on-site for Conversions only) - Email PCSD 06 – Project Exchange Form
Stage 3 Receive Exchange Meeting Minutes from External Project Manager - Email Exchange Meeting Minutes (Updated PCSD 06 - Project
Exchange Form)
Receive Stage 3 drawings from Architect and PCI from Principal Designer prior to
PCI
submission of planning applications - Email Stage 3 Drawings
Receive Dashboard Updates and Photographic Reports from Shell Monitor - Email Dashboard Update
throughout the during of the Developer’s shell construction phase Photographic Report
2A.1 Developer led project RAM 0.0 11.10.19