Page 114 - CRS Engineering
P. 114
SI Description Remarks
No
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and - NO -
as oer the standards?
ii) Is the top width of the bund as per - NO -
standards?
iii) Are the slopes as per the standards? - NO -
iv) Any dangerous gullies or scour of the - NO -
bund?
C) Surplus Weir
i) Condition Yes
ii) Is the Length adequate for Design -
discharae?
iii) Is Danger Level marked Yes
D) Condition of the Sluices Damaged sluice was reconstructed
E) Any Past history of Breach of the -
tank if so. details.
Assistant Executive Engineer, Deputy'Executive Engineer,
Irrigation Section, Irrigation Sub-Division,
SRIKALAHASTI. SRIKALAHASTI.
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.