Page 115 - CRS Engineering
P. 115
Proforma for Joint Inspection on R. A. T.
For the Year 2020 -21
Si Description Remarks
No
I General Particulars of RAT
1 Name of the tank Reddy Gunta Tank
2 District Chittoor District
3 Name of the Village and Mandal Kapuguneeri Village, Srikalahasti Mandal
4 Latitude & Longitude Lat 13° - 43' - 09" Long 79° - 38' - 53"
5 Affected Railway Bridge and Km The Tank Lies in-between Bridge No:-90&64 /
6 Railway section in between stations Rachagunneri
7 Distance from Railway Bridge to weir 60 Mts from the Railway line to the tank.
( Along the Course of Nallah )
II Standard Hydraulic Details
1 Catchment Area
2 Capacity of the tank
3 Lowest Bed Level + 98.60M
4 Full Tank Level ( F.T.L ) +100.00M
5 Maxim Water Level ( M.W.L ) + 100.60M
6 Danger Level ( D.L ) + 100.85M
7 Top of Bund Level ( T.B.L ) + 101.50M
8 Top Width of the Bund 1.20M, 1.50M ( Present Top Width )
9 Side Slopes AT FRONT:- 1 Ya : 1 , AT REAR :- 2:1
10 Area of Submergence at FTL -
11 Area of Submergence at MWL -
12 Are there any tanks in the Catchment of NO
this tank
13 Are these tanks also classified as RATs -
14 Names and details of these tanks -
Surplus Weir
III -
Number of Surplus Weirs ONE NUMBER ONLY ( 1 No Only )
1
Lengths of Surplus Weir
2
3 Type of Surplus Weir B.C WEIR
4 Design Discharge -
IV sluices -
Number of Sluices TWO NUMBERS ONLY ( 2 Nos Only )
1
Location of Sluices
2
Maximum designed discharge 2.50 CUSECS —
3
Functional or not FUNCTIONAL
4
Inspection details
V
5^5-02-2020
nf Inspection
)Name& Designatlon^the Inspection 1) Sri. C. Willson Babu,
Assistant Divisional Engineer ,
South Central Railway
RENIGUNTA
2) Sri. C.Adinarayana Naidu, B.Tech.^
Deputy Executive Engineer ,
Irrigation Sub Division
3) Sri. K Kajesh,B.Tech.,
Assistant Executive Engineer,
Irrigation Section
SRIKALAHASTI