Page 116 - CRS Engineering
P. 116
Description Remarks
SI
No
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and - NO -
as oer the standards?
ii) Is the top width of the bund as per - NO -
standards?
iii) Are the slopes as per the standards? - NO -
iv) Any dangerous gullies or scour of the
hund?
C) Surplus Weir -
i) Condition -
ii) Is the Length adequate for Design
Hi^rharae?
iii) Is Danger Level marked Yes
D) Condition of the Sluices Yes
E) Any Past history of Breach of the
tank if details.
iTu ynp
Assistant' ExScdTive Engiheer, Deput^E)(ectn;iVe tngineer,
Irrigation Section, Irrigation Sub-Division,
SRIKAI-AHASTI. SRIKAU\HASTI.
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.