Page 292 - CRS Engineering
P. 292

PROFORMA FOR SUBMISSIONOF R.A.T INSPFmOM                      Annexure II
                                         Description
                                                                                    Remarks
                        [General particularsof RAT
                     1   Name of the tank
                                                                 RAMALINGA SAMUDRAM CHERUVll
                         Tank ID
                                                                 CHCT0028000PAk    ^
                         District
                                                                 CHITTOOR
                        INameof village &Mandal
                                                                 Chinthapenta (V) Penumur Mandal
                         Latitude & Longitude                    13° 22'45"  & 79° 14' 15"
                        [Afficted Railway Bridge &KM             616 KM 48/8-9
                    ~6  IRailway section and between stations    5SE PWCTO PTT-PAk
                         Distance from Railway bridge to weir (along the course or
                     7  INallah)
                                                                 7.4 KM
                         Standard Hydraulic Details
                     1  ICatchment Area
                                                                 11.32 Sq.Miles
                    "2  Icapacity oftheTank
                                                                 27.77Mcft
                                                                   338.17 M
                     4  IFull Tank Level (FTL)
                                                                   342.14 M
                        Maximum water level (MWL)
                                                                   342.90 M
                     6  IDanger Level (PL)
                        [Top of Bund Level (TBL)
                                                                   344,12 M
                                                                 1.50 M
                                                                 Front 1.5:1  Rear?-i
                    10  [Area of submergence at FTL             6.40 M.Sq.feet 0.595 M.So.M
                   ~n [Area ofsubmergence at MWL
                    12  [Are there any tanks in the catchment of these tank ?
                                                                yes
                    13  Are these tanks also classifed as RATs' ?
                                                                yes
                    14  Names & Details of these tanks
                                                                15N0S
                    III  [Surplus weir
                                                                INos,
                                                                52.73 M+8.38 M
                       [Typesof surplus weirs
                                                                         + Rockev ground e.rapp
                    4  IDesign Discharge                        2521 Cft./Sec. or71.39CUM/Spr
                    IV  Sluice
                                                                3Nos
                                                                IVsR/s
                       [Maximum Design Discharge
                                                                functioned
                    V  [A. Inspection Detailes
                       ji) Dateof inspection
                                                                22.2.20
                       ii) Name & Designation of               2'sri            ' DEE,ISD,G.D.Nellore@Chittoor,
                       Inspecting Officials                    3Sri MNKril'          section,Penumuru.,

                       iii; It the tank qualify for   classirication
                       as RAT
                                                               Yes
                       i) Is the Toplevel of the Bund
                       uniform and as per the standards
                                                               yes
                      |ii) Is the Top width of the Bund as per the standards
                                                               Yes
                       iii)Are the slopes as per the standards
                                                               yes
                       Iv) Any Dangerous gullies or
                       scoure of the Bund
                                                               No.
                       C. Surplus Weir
                      ]i) Condtion                             WorkJnProgress
                      jii) Is the length adquate for  Design Discharge  yes
                      IHi) Is Danger Level Marked ?
                      iD.Condition of the Sluices
                                                                                         AGoic.!untL7:.':ctrt
                      |e. Any Past History of Breach of the Tank and if so, details      lRRlC.4TiON :..'.dTiON
                                                               No.
                Remarks ; Work in Progress                                                 ^ jPENUMURl




                            Signature with Name & Designation         Signaturewith Name&Desig^
                                   of Railway Official
                                                                            of Irrigation Official  /
                                                                    DEPUTY EXEGOTSVE
                               Asst. T-ivl. L-ngineer
                                                                    IRRiGM. SUB-DIVIN. G.D.NELLORE @
                                     / S.C. Railway
                                                                             CHITTOOR.
                                       riiRUP^TI
   287   288   289   290   291   292   293   294   295   296   297