Page 97 - CRS Engineering
P. 97
Proforma for Joint Inspection on R. A. T.
For the Year 2020 -21
SI Description Remarks
No
I General Particulars of RAT
1 Name of the tank Thummalapakulagunta Tank
2 District Chittoor District
3 Name of the Village and Mandal Cherukulapadu Village, Srikalahasti Mandal
4 Latitude & Longitude Lat 13° - 31' - 15" Long 79° - 40' - 18"
5 Affected Railway Bridge and Km The Tank Lies in-between Bridge No:- 70&57 /
24-26
6 Railway section in between stations Yellakaru
7 Distance from Railway Bridge to weir 400M from the Railway line to the tank.
( Along the Course of Nallah )
II Standard Hydraulic Details
1 Catchment Area 0.77 Sq miles
2 Capacity of the tank 17.60 MCFT
3 Lowest Bed Level + 97.90M
4 Full Tank Level ( F.T.L ) + 100.OOM
5 Maxim Water Level ( M.W.L ) + 100.60M
6 Danger Level ( D.L ) + 101.20M
7 Top of Bund Level ( T.B.L ) + 101.50M
8 Top Width of the Bund 1.50 M , ( Present Top Width )
9 Side Slopes AT FRONT:- 1 '/z : 1 , AT REAR :- 2:1
10 Area of Submergence at FTL -
Area of Submergence at MWL -
11
12 Are there any tanks in the Catchment of NO
this tank
13 Are these tanks also classified as RATs -
14 Names and details of these tanks -
III Surplus Weir -
1 Number of Surplus Weirs ONE NUMBER ONLY ( 1 No Only )
2 Lengths of Surplus Weir 11.00 M
3 Type of Surplus Weir B.C WEIR
4 Design Discharge 396 Cusecs
IV Sluices -
TWO NUMBERS ONLY ( 2 Nos Only )
1 Number of Sluices
2 Location of Sluices
Maximum designed discharge 2.50 CUSECS —
3
4 Functional or not FUNCTIONAL
V A) Inspection details -
§'.5-02-2020
Date of Inspection
)Name& Designation of the Inspection 1) Sri. C. Willson Babu,
Assistant Divisional Engineer ,
South Central Railway
RENIGUNTA
2) Sri. C.Adinarayana Naidu, B.Tech.
Deputy Executive Engineer .
Irrigation Sub Division
3) Sri. K Rajesh,B.Tech.,
Assistant Executive Engineer .
Irrigation Section
SRIKALAHASTI