Page 98 - CRS Engineering
P. 98
I
Description
No Remarks
Hi) If tank quality for classification as RAT i 1
YES
3) Tank Bund
Is the top level of the bund uniform and
- NO -
as oer the standards?
ii) Is the top width of the bund as per
- NO -
standards?
) Are the slopes as per the standards?
- NO -
v) Any dangerous gullies or scour of the
- NO -
3und?
C) Surplus Weir
Condition
Yes
i Is the Length adequate for Design
Id scharae?
ii ) Is Danger Level marked
Yes
1 D) Condition of the Sluices Damaged Sluice was Reconstructed.
1 E) Any Past history of Breach of the
1rank if so, details.
t Executive Engineer.Engineer,
Assistant"Executive
Deputv gineer.
Irrigation Section, Irrigation Sub-Division,
SRIKAI-AHASTI. SRIKALAHASTI.
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.
m