Page 96 - CRS Engineering
P. 96
SI Description Remarks
No
iii) If tank quality for classification as RAT YES
B) Tank Bund
i) Is the top level of the bund uniform and - NO -
as oer the standards?
ii) Is the top width of the bund as per - NO -
standards?
iii) Are the slopes as per the standards? - NO -
iv) Any dangerous gullies or scour of the - NO -
bund?
C) Surplus Weir
i) Condition Yes
ii) Is the Length adequate for Design
discharae?
iii) Is Danger Level marked Yes
D) Condition of the Sluices Sluice is Damaged it is to be Reconstructed.
E) Any Past history of Breach of the
tank if so. details.
Assistant Executive tn^ineer, DeputyE^ecGti'^e Engineer,
Irrigation Section, Irrigation Sub-Division,
SRIKALAHASTI. SRIKAU^HASTI.
Assistant Divisional Engineer,
South Central Railway,
RENIGUNTA.