Page 96 - CRS Engineering
P. 96

SI                    Description                                         Remarks
            No
                 iii) If tank quality for classification as RAT                          YES


                 B) Tank Bund
                 i) Is the top level of the bund uniform and                            - NO -
                 as oer the standards?
                 ii) Is the top width of the bund as per                                - NO -
                 standards?
                 iii) Are the slopes as per the standards?                             - NO -
                 iv) Any dangerous gullies or scour of the                             - NO -

                 bund?
                 C) Surplus Weir
                 i) Condition                                                            Yes
                 ii) Is the Length adequate for Design
                 discharae?
                 iii) Is Danger Level marked                                             Yes
                 D) Condition of the Sluices                    Sluice is Damaged it is to be Reconstructed.
                 E) Any Past history of Breach of the
                 tank if so. details.













                         Assistant Executive tn^ineer,                      DeputyE^ecGti'^e Engineer,

                               Irrigation Section,                             Irrigation Sub-Division,
                                SRIKALAHASTI.                                     SRIKAU^HASTI.










                                                                           Assistant Divisional Engineer,
                                                                               South Central Railway,
                                                                                    RENIGUNTA.
   91   92   93   94   95   96   97   98   99   100   101