Page 212 - Mines Facilities Plan
P. 212
chiller were to go down in Chilled Water Plant 6 (1,300 tons) and one chiller in
producing approximately 4,300 GPM of chilled water and would be distributed
Chiller Plant 8 is anticipated to house three (3) 600 ton chillers. This size was
with 14” chilled water mains and tied into the existing loop for Chiller Plants 6
Chiller Plant 7 (540 tons) simultaneously. These chillers would be capable of
will have some, although small, redundancy until this last building is brought
Building 3 is anticipated to start after 2030. The Chiller Plants 6 and 7 loop
In order to provide redundancy and backup, Mines should construct a new
maximum operation capabilities including diversity. Therefore, there is no
Chiller Plant 8 as a part of Research Building 3. The design for Research
determined to give Chiller Plant 8 the ability to provide redundancy if one
Research Buildings 1, 2, and 3. Chiller Plants 6 and 7 will be near their
Mines intends to loop Chiller Plants 6 and 7 to provide chilled water to
RESEARCH PARK CHILLER PLANT (CP8)
system redundancy or backup. and 7. See Appendix 2: Utilities Master Plan for more information. Necessary precedent projects: None Enabled projects: Research Building 3 Colorado School of Mines Facilities Master Plan
UTILITIES THE NEED THE PROJECT online. THE SITE N/A 206