chiller were to go down in Chilled Water Plant 6 (1,300 tons) and one chiller in
                                                                                           producing approximately 4,300 GPM of chilled water and would be distributed
                                                                                Chiller Plant 8 is anticipated to house three (3) 600 ton chillers. This size was
                                                                                              with 14” chilled water mains and tied into the existing loop for Chiller Plants 6
                                                                                        Chiller Plant 7 (540 tons) simultaneously. These chillers would be capable of
                                                                         will have some, although small, redundancy until this last building is brought
                                                                      Building 3 is anticipated to start after 2030. The Chiller Plants 6 and 7 loop
                                                                In order to provide redundancy and backup, Mines should construct a new
                                                      maximum operation capabilities including diversity. Therefore, there is no
                                                                   Chiller Plant 8 as a part of Research Building 3. The design for Research
                                                                                  determined to give Chiller Plant 8 the ability to provide redundancy if one
                                                   Research Buildings 1, 2, and 3. Chiller Plants 6 and 7 will be near their
                                                 Mines intends to loop Chiller Plants 6 and 7 to provide chilled water to
                                                                                                                      



                                          RESEARCH PARK CHILLER PLANT (CP8)






                                                         system redundancy or backup.           and 7. See Appendix 2: Utilities Master Plan for more information.  Necessary precedent projects: None Enabled projects: Research Building 3  Colorado School of Mines Facilities Master Plan







                                 UTILITIES    THE NEED        THE PROJECT   online.                          THE SITE  N/A  206