Page 12 - Bernardon Proposal for Design Services-26th Street Residences
P. 12
www.bernardon.com
budget will be used by the Interior Design team as well Included in this phase is the finalized FF&E budgets
as Bernardon Procures, our procurement team, during for both the amenity spaces and model unit, including
the FF&E phase. Furniture selections will be presented Artwork and Decorative Accessories. This finalized
as part of the FF&E phase of the project. approved budget will be used by the Interior Design team
as well as Bernardon Procures during the FF&E phase.
Once we have received approval from you for our Design
Development phase, we will proceed onto Phase III –
Construction Documents. Phase IV - Construction Administration
During this phase, we have assumed a role including the
following:
Phase III - Construction Documents
Based on approvals made during Design Development, ■ Answer RFIs during the subcontractor bid period;
Bernardon will move forward with interior ■ Attend a pre-construction meeting;
documentation of the amenity design and unit finish ■ Attend on-site construction observation meetings
selections for bidding and construction. Tasks and as requested [maximum of five (5)];
deliverables during this phase will include: ■ Attend OAC calls during construction as requested
[maximum of ten (10)]; and
Amenity Space and Common Area ■ Review specific shop drawings (custom/specialty
■ Interior finish plans; items, millwork, finishes and as outlined in our
■ Interior furniture plans; book specifications).
■ Lighting/reflected ceiling plans and details;
■ Lighting fixture schedule; We anticipate an 18-month construction period. If
■ Plumbing fixture schedule; the construction period is longer than anticipated or
■ Interior details; if additional meetings are required outside of the fault
■ Millwork plans, elevations, and details; of the design team, we reserve the right to invoice our
■ Technical specifications (book format); and additional time as Additional Services.
■ One (1) meeting to review any outstanding items
prior to final documentation.
Phase V – Furniture, Fixtures & Equipment (FF&E),
Unit finish selections tasks and deliverables during this Artwork and Decorative Accessories
phase will include: Bernardon understands the specific needs of a residential
community and will select and design interior and
Unit Finish Selections exterior amenity space furnishings that emphasize
■ Unit finish plans; the unique character of the interior design theme and
■ Presentation board showing final selected unit distinguish the amenity spaces from its competitors. We
finishes; will specify items including furniture, fabrics, table and
■ Model Unit furniture plan; floor lamps, window treatments, artwork, and decorative
■ Lighting fixture schedule; accessories. As part of this phase, the following services
■ Plumbing fixture schedule; and and deliverables will be provided:
■ One (1) meeting to review any outstanding items
prior to final documentation.
BERNARDON | Proposal for Design Services
PE Real Estate Holdings | 26th Street Residences, Pittsburgh, Pennsylvania | February 22, 2022 Page 8