               budget will be used by the Interior Design team as well   Included in this phase is the finalized FF&E budgets
               as Bernardon Procures, our procurement team, during   for both the amenity spaces and model unit, including
               the FF&E phase. Furniture selections will be presented   Artwork and Decorative Accessories. This finalized
               as part of the FF&E phase of the project.            approved budget will be used by the Interior Design team
                                                                    as well as Bernardon Procures during the FF&E phase.
               Once we have received approval from you for our Design
               Development phase, we  will  proceed  onto  Phase  III –
               Construction Documents.                              Phase IV - Construction Administration
                                                                    During this phase, we have assumed a role including the
                                                                    following:
               Phase III - Construction Documents
               Based on approvals made during Design Development,       ■ Answer RFIs during the subcontractor bid period;
               Bernardon   will  move   forward  with   interior        ■ Attend a pre-construction meeting;
               documentation of the amenity design and unit finish      ■ Attend on-site  construction  observation meetings
               selections for bidding and construction.  Tasks and     as requested [maximum of five (5)];
               deliverables during this phase will include:             ■ Attend OAC calls during construction as requested
                                                                       [maximum of ten (10)]; and
                 Amenity Space and  Common Area                         ■ Review specific shop drawings (custom/specialty
                    ■ Interior finish plans;                           items, millwork, finishes and as outlined in our
                    ■ Interior furniture plans;                        book specifications).
                    ■ Lighting/reflected ceiling plans and details;
                    ■ Lighting fixture schedule;                    We anticipate an 18-month construction period.  If
                    ■ Plumbing fixture schedule;                    the construction period is longer than anticipated or
                    ■ Interior details;                             if additional meetings are required outside of the fault
                    ■ Millwork plans, elevations, and details;      of the design team, we reserve the right to invoice our
                    ■ Technical specifications (book format); and   additional time as Additional Services.
                    ■ One (1) meeting to review any outstanding items
                   prior to final documentation.
                                                                    Phase V – Furniture, Fixtures & Equipment (FF&E),
               Unit finish selections tasks and deliverables during this   Artwork and Decorative Accessories
               phase will include:                                  Bernardon understands the specific needs of a residential
                                                                    community and will select and design interior and
                 Unit Finish Selections                             exterior amenity space furnishings that emphasize
                    ■ Unit finish plans;                            the unique character of the interior design theme and
                    ■ Presentation board showing final selected unit   distinguish the amenity spaces from its competitors.  We
                   finishes;                                        will specify items including furniture, fabrics, table and
                    ■ Model Unit furniture plan;                    floor lamps, window treatments, artwork, and decorative
                    ■ Lighting fixture schedule;                    accessories.  As part of this phase, the following services
                    ■ Plumbing fixture schedule; and                and deliverables will be provided:
                    ■ One (1) meeting to review any outstanding items
                   prior to final documentation.