Page 11 - Bernardon- Response to RFP for Food Bank of Delaware
P. 11

www.bernardon.com















               Conestoga Food Bank, Conestoga, PA
                      ■Project name and owner:      Conestoga Food Bank for Bethel Evangelical Congregational Church
                      ■Year completed:             Currently in design.  Anticipated completion 2022-2023.
                      ■Building type:              The Conestoga Food Bank is an unincorporated organization that is the
                                                   fiduciary responsibility of Bethel Evangelical Congregational Church
                                                   (BECC).  BECC needed to provide a food storage structure at the rear of the
                                                   existing church property located at 3716 Main Street in Conestoga, PA.
                                                   The 780 square foot storage building will provide a 610 square foot space
                                                   to accommodate dry food storage and cold food storage for the Food Bank
                                                   and a 170 square foot utility garage for use by BECC.
                      ■Type of project:            New
                      ■Form of Construction Delivery:    To be determined
                      ■Construction cost:          Currently in design; cost not yet available.

               Cold Storage Warehouse, Oldmans Township, NJ
                      ■Project name and owner:      Cold Storage Warehouse for The Manfredi Companies
                      ■Year completed:             Phase I is currently under construction.  Anticipated completion 2022.
                      ■Building type:              The project is a cold storage warehouse consisting of 583,550 SF
                                                   of warehouse and 20,000 SF of office and support space when fully
                                                   constructed. Phase 1 is currently under construction and is comprised of
                                                   103,000 SF.  The exterior of the building is insulated metal wall panels.
                      ■Type of project:            New
                      ■Form of Construction Delivery:    CM-at-risk be determined
                      ■Construction cost:          Withheld at Owner’s request.

               Country Fresh Mushrooms, Toughkenamon, PA
                      ■Project name and owner:      Country Fresh Mushroom Co.
                      ■Year completed:             Packaging Plant and Vehicle Maintenance - 2014; Vacuum Cooler Addition
                                                   - 2015; Shipping Office Addition - 2016
                      ■Building type:              The project is a 57,000 SF packaging plant with a 4,000 SF free-stranding
                                                   vehicle maintenance facility for Country Fresh Mushrooms, the only
                                                   family-owned cooperative of independent mushroom farms in the United
                                                   States.  Subsequent design services included a new vacuum cooler and
                                                   shipping office additions.
                      ■Type of project:            New
                      ■Form of Construction Delivery:    CM-at-risk
                      ■Construction cost:          Withheld at Owner’s request.









            BERNARDON  |  Response to Request for Proposal for Architecture/Engineering Services
            Food Bank of Delaware  |  New Food Bank Facility in Milford, DE  |  August 3, 2021             Page 7
   6   7   8   9   10   11   12   13   14   15   16