Page 24 - The TM Submarine Cable Book
P. 24

3: The Landing Point

                          4.  MIRI (MR)                            SKRM

                           Submarine Cable                         Sistem Kabel Rakyat  Malaysia.

                           Station

                                                                                                       SB1 BU  SB2 BU
                                                                                                      SB4 BU SB3 BU S4  K. Kinabalu
                                                                          Cherating  PS1 BU  S5   SR2 BU  SR3 BU
                                                                                   PS2 BU         SR1 BU  S3  Miri
                                                                                        S1
                                                                                                 S2  Bintulu
                                                                            Mersing
                                                                                             Kuching



                                                                      Operation & Maintenance

                                                                      Strength
                           Ready  for  service  in  1996  Miri
                           Cable Station which are located in
                           a rapid Oil & Gas state too, are one       Miri cable station has the strength of
                           of  the  landing  station  situated  at    one station manager and three
                           north Sarawak region to cater for          technical expertises with normal
                           the     Malaysian       Domestic           manning hours and on standby basis.
                           Submarine      Cable     System
                           (MDSCS)  link  to  Bintulu  and  via
                           branching  unit  to  Kuching  and
                           Labuan.

                           Sistem  Kabel  Rakyat  Malaysia
                           (SKRM) commences its service in                                   Technical Assistant
                           2017,  connecting  Miri  Cable
                           Station  to  Bintulu  Cable  Station
                           and  Tg  Aru  Cable  Station  in
                           Sabah.
                                                                                             Technical Assistant

                           Connections.                                      Station Manager


                         MDSCS
                         Malaysian Domestic Submarine
                         Cable System.                                                       Technical Assistant






                                                                         Miri O&M chart





                                                              23
   19   20   21   22   23   24   25   26   27   28   29