Page 10 - August 2022 Track N Times
P. 10

INTERNATIONAL NEWS—INDIA





            Test Site Establishment in India for SRGM Continued





              •  Rail Year of laying                                           properly on the rail using the telescopic

              •  GMT/Year                                                      rod.
              •  GMT Passed till date                                       •   Record  the  detailed  location  parame-
              •  Degree of Curve (DOC)                                         ters for each MiniProf reading either in

              •  Superelevation                                                the file itself or on a separate data col-
             The  following  data  should  be  collected  as  a               lection sheet.

              baseline at each point (10.1 to 10.8) in a turn-              •   Clear  well-lit  and  labelled  photographs
              out as shown in Figure 3 for each grind cycle.                   of  the  rail  surface  to  be  captured  ob-
                                                                               serving from top.

                                                                     Perform  dye  penetrant  test  directly  adjacent  to
                                                                      the location where the MiniProf reading was tak-

                                                                      en.
                                                                     Clear well-lit and labelled photographs of the rail
                                                                      to be captured after dye penetrant test (pre-grind

                                                                      only).
                                                                     Using  the  aforementioned  key  points  a  total  of

                                                                      seventy-two (72) test sites have been successfully
                                                                      established  across  six  (6)  Zonal  Railways  of  IR,
                  Figure 3 Turnout sample test site
                                                                      over the past four (4) months.

             MiniProf (Best practices to be followed)
              •  Establish a location on the rail between two      Key Learnings

                  sleepers and at least 3 meters from a joint      The tireless support and guidance of Mr. Charles Ru-
                  or weld.                                         deen and Loram, USA to the VIPL team helped in the
              •  Clearly label the exact location on the rail      establishment of seventy-two (72) SRGM test sites in

                  to perform measurement during each grind         India resulted with the following outcomes:
                  cycle.                                             Procedures for establishment of SRGM test sites

              •  Ensure that the rail is free from grease and         in India is now well understood.
                  debris.                                            Awareness,  planning  and  management  of  SRGM
                  •   Check  whether  the  MiniProf  is  placed       test sites in India.




                                                                                                             Page 8
         VOLUME 3 : ISSUE 7
   5   6   7   8   9   10   11   12   13   14   15