                                                                    Sample Internal Proposal                  461





                           Memo to Dr. Jill Bremerton   October 6, 2011       Page 5
                              Our	preliminary	research	indicates	that	there	are	two	major	technologies	used	in
                              clicker	systems:	infrared	(IR)	and	radio	frequency	(RF)	(Ohio	State	University,	  The writers cite their sources
                              2005).	IR,	the	technology	used	in	television	remote	controls,	requires	a	clear	  throughout the proposal.
                              line	of	sight	and	has	a	limited	range	(40–80	feet).	If	IR	is	to	be	used	for	greater
                              distances,	the	room	would	need	to	have	additional	receivers	installed	on	the	walls
                              and	connected	either	by	wires	or	wirelessly	to	the	instructor	podium.	In	addition,	IR
                              signals	can	be	disrupted	by	some	classroom	lighting	systems.
                              By	contrast,	RF	systems	do	not	require	a	clear	line	of	sight,	have	no	range	limitations,
                              and	are	not	subject	to	electronic	interference.	An	RF	system	uses	a	receiver	built	into
                              a	USB	device	that	attaches	easily	to	the	computer	in	the	podium	or	to	the	instructor’s
                              laptop.	For	these	reasons,	RF	systems	are	simpler	and	are	becoming	the	industry	  The writers present just enough
                              standard.                                                     information about the two
                                                                                            technologies to help the reader
                              However,	IR	systems	are	less	expensive,	with	clickers	costing	less	than	$10.	Therefore,	  understand their logic. Writers
                              if	CMSU	lecture	halls	meet	the	line-of-sight	and	range	requirements,	already	have
                              receivers	installed,	and	pose	no	interference	risk,	IR	systems	would	be	an	option.	But	  sometimes present too much
                              if	any	of	the	lecture	halls	does	not	meet	one	or	more	of	these	criteria,	CMSU	should	  information; write only as much
                              consider	only	RF	systems.                                     as necessary to get the job done.
                              We	would	meet	with	Marvin	Nickerson,	the	Director	of	Physical	Plant,	to	explain	our	  The writers have already
                              project	and	to	give	him	a	list	of	the	questions	we	need	to	answer.  determined whom they need to
                                                                                            interview to get the information
                            Task 5.	Research the existing computer environment in the lecture halls.
                              We	would	seek	to	answer	the	following	question:	“Would	the	computer	platforms	  they need.
                              and	operating	systems	used	in	the	instructor	stations	in	the	large	lecture	halls	affect
                              the	decision	whether	to	adopt	clickers	or	restrict	the	university	to	a	particular
                              technology	or	brand	of	clicker?”
                              We	would	need	to	determine	which	platforms	(Windows,	Macintosh,	or	other)	and
                              which	operating	systems	(for	example,	Windows	XP,	Vista,	or	7,	or	Macintosh	OSX)
                              are	used	in	the	computers	in	each	podium	in	the	large	lecture	halls	identified	by	Mr.
                              Nickerson.	This	information	would	be	necessary	to	ensure	that	any	clicker	system
                              CMSU	selects	is	compatible	with	the	existing	computer	technology	in	the	lecture	halls.
                              We	would	meet	with	Arlene	Matthews,	the	Director	of	Academic	Technologies,	to	explain
                              our	project	and	to	give	her	a	list	of	the	questions	we	needed	to	answer.	As	Director	of	AT,
                              Ms.	Matthews	has	a	database	of	this	information	because	AT	participated	in	installing	all
                              the	instructor	podiums	and	related	systems	in	all	the	lecture	halls.
                            Task 6.	Analyze our data and prepare this recommendation report.  Preparing the recommendation
                              We	would	prepare	a	recommendation	report	that	explains	the	questions	we	sought	to	  report is part of the project
                              answer,	our	research	methods,	and	our	findings.               because the report is the
                                                                                            deliverable.