3.18  The Vendor will perform a conference room pilot run at the Client’s premises which will
                          comprise of all relevant  data entry screens, calculation and system security features
                          through  the  steering  committee.  The  pilot  run  will  not  necessarily  have  the  entire
                          reporting requirements of the Client at this state. However the pilot run will complete
                          several cycles of the entire process flow to ensure that the system includes the client’s
                          requirements.  Thereafter  the  Vendor  will  provide  a  detailed  schedule  for  the  live
                          implementation.
                     3.19  The Vendor will then commence the user training at the Client site and the steering
                          committee will ensure that the appropriate personnel will be made available and such
                          personnel will not be disturbed or given other task during this training period.

                     3.20  The Client will sign off the User Training and system acceptance document.
                     3.21  During  the  parallel  run  the  steering  committee  will  ensure  sufficient  data  entry
                          operators are provided to cope up with dual task of handling the existing Client system
                          in addition to the new system.

                     3.22  Once the parallel run or system implementation commences the vendor will perform a
                          weekly review off/on site and the project status report will be emailed.

                     3.23  The  Vendor  is  not  obliged  to    modify  the  software  free  of  charge    on  account  of
                          recently  hired  personnel,  change  in  management,  change  in  ownership,  additions  or
                          changes  in  business  operations  or  to  accommodate  features  of  previously  operated
                          software which has no bearing on the information requested by the client after signing
                          the GAP analysis.
                     3.24  DSPL staff has been strictly advised not to Amend /Delete data in the database unless
                          such  request  are  made  in  writing  by  the  Board  of  Directors  and  approved  by  DSPL
                          management.

                     3.25  The Vendor reserves the right to conduct an aptitude test for all personnel appointed
                          (eg: Data Entry Operators)

                     3.26  Client shall not distribute the SOFTWARE to any third party.  Client shall not make any
                          modifications to the SOFTWARE, unless otherwise allowed under the License Agreement
                          with Vendor.

               4.  Parallel Run & Implementation

                      4.1 The  Outstanding  Issue  Log  (Excel  Sheet)  will  be  emailed  with  vendor  &  Client
                         outstanding activities (Separate Sheets)

                      4.2 Conference  call  will  be  agreed  upon  in  advance  with  dates  and  times.  (Steering
                         committee  & vendor team must attend)



               5.  Training

                       5.1 Vendor will provide training to Client on each module based on discussion with steering
                          committee on how such training program must be conducted

                       5.2 User training sign off must be done by user and finally by the steering committee

                       5.3 The training cost will be as included in software quotation. Subsequent training cost is
                          included in maintenance agreement

                       5.4 The  Vendor  has  option  to  bill  the  Client  in  the  event  of  such  training  programs
                          requirement is beyond the scope of normal procedures.