Page 19 - Paparan KI Sadai_Neat
P. 19
Sadai Integrated Industrial and Port, South Bangka - Indonesia
RATION
BANGKA Smart Sea-Port | Logistics center | Industrial Estate
ABADI
Labor Requirement
In accordance with the Regulation of the Minister of Industry Technical Guidelines for
Industrial Estate Development No 40/2016 then with an industrial plot area of 540.92 ha there
will be 54,092 ha of labor with the following composition
The manager for 3% or 1,623 people,
Staff 20% or 10,818 people, and
Labor 41,651 people.
LABOR (People)
INDUSTRIAL
NO NAME OF AREAS
LOTS AREA MANAGER STAFF LABOURER
TOTAL
3% 20% 77%
1 2 3 4 5 6 7
1 Sadai Industrial Area 541 54.092 1.623 10.818 41.651