Page 23 - Paparan KI Sadai_Neat
P. 23

Sadai Integrated Industrial and Port, South Bangka - Indonesia
                        RATION                                                Smart Sea-Port   |   Logistics center   |   Industrial Estate
                        BANGKA
                        ABADI
                                               Electrical Energy Needs





        The electrical energy needs of the Sadai industrial area are based on calculations that refer to Ministerial

        Regulation Number: 40 of 2016 concerning Technical Guidelines for the Construction of Industrial Estates,

        where industrial plots in the Sadai Industrial Zone are approximately 540,923 ha, built as a whole needed

        electric power of 126.26 MVA.




        • Short Term 1-3 Years required electrical energy                       : 39,84 MW

        • Medium Term 4 - 7 Years old requires electrical energy                : 42,27 MW

        • Long Term 8-15 Years Electricity is needed                            : 44,15 MW




        To meet the electrical energy needs, a power plant will be built in stages. In the short term of the initial year

        planned Biomasa power plant with raw materials utilizing Kaliandra plants with a capacity of 2 x 12.5 MW,

        for the medium term 4-7 years adjusted to the needs where it is assumed that in 3-4 port development will

        begin to be built and will soon operate , that’s why it is needed. Other power plants are prepared by utilizing

        raw materials Coal must be built at least 2 x 20 MW, while for the long term 8-15 years, the construction of

        a 70 MW power plant is needed, so that overall it can achieve a total electricity production of 135 MW.