Page 23 - Paparan KI Sadai_Neat
P. 23
Sadai Integrated Industrial and Port, South Bangka - Indonesia
RATION Smart Sea-Port | Logistics center | Industrial Estate
BANGKA
ABADI
Electrical Energy Needs
The electrical energy needs of the Sadai industrial area are based on calculations that refer to Ministerial
Regulation Number: 40 of 2016 concerning Technical Guidelines for the Construction of Industrial Estates,
where industrial plots in the Sadai Industrial Zone are approximately 540,923 ha, built as a whole needed
electric power of 126.26 MVA.
• Short Term 1-3 Years required electrical energy : 39,84 MW
• Medium Term 4 - 7 Years old requires electrical energy : 42,27 MW
• Long Term 8-15 Years Electricity is needed : 44,15 MW
To meet the electrical energy needs, a power plant will be built in stages. In the short term of the initial year
planned Biomasa power plant with raw materials utilizing Kaliandra plants with a capacity of 2 x 12.5 MW,
for the medium term 4-7 years adjusted to the needs where it is assumed that in 3-4 port development will
begin to be built and will soon operate , that’s why it is needed. Other power plants are prepared by utilizing
raw materials Coal must be built at least 2 x 20 MW, while for the long term 8-15 years, the construction of
a 70 MW power plant is needed, so that overall it can achieve a total electricity production of 135 MW.