Page 24 - Paparan KI Sadai_Neat
P. 24

Sadai Integrated Industrial and Port, South Bangka - Indonesia
                        RATION                                                Smart Sea-Port   |   Logistics center   |   Industrial Estate
                        BANGKA
                        ABADI
                               Raw Water and Dirty Water Generation





        The need for raw water to meet the needs of the Sadai Industrial area in the future is

        estimated at 298 liters / second. (Water Treatment Plant (WTP))




        The generation of dirty water from each type and every industrial plot in the area is

        estimated at 238 liters / second. (Wastewater Treatment Plant (WWTP))






                   SHORT TERM                              MEDIUM TERM                                    LONG TERM




                                                                                                                              3
                                                                               3
                                  3
           •  WTP Phase I ( 200 m /hour )        •  WTP Phase II ( 250 - 500 m /hour )       •  WTP Phase III ( 500 - 1.000 m /hour )
                                                                                                                               3
                                                                                 3
                                    3
           •  WWTP Phase I ( 200 m /hour)        •  WWTP Phase II ( 250 - 500 m /hour )      •  WWTP Phase III (500 - 1.000 m /hour)
   19   20   21   22   23   24   25   26   27   28   29