Page 24 - Paparan KI Sadai_Neat
P. 24
Sadai Integrated Industrial and Port, South Bangka - Indonesia
RATION Smart Sea-Port | Logistics center | Industrial Estate
BANGKA
ABADI
Raw Water and Dirty Water Generation
The need for raw water to meet the needs of the Sadai Industrial area in the future is
estimated at 298 liters / second. (Water Treatment Plant (WTP))
The generation of dirty water from each type and every industrial plot in the area is
estimated at 238 liters / second. (Wastewater Treatment Plant (WWTP))
SHORT TERM MEDIUM TERM LONG TERM
3
3
3
• WTP Phase I ( 200 m /hour ) • WTP Phase II ( 250 - 500 m /hour ) • WTP Phase III ( 500 - 1.000 m /hour )
3
3
3
• WWTP Phase I ( 200 m /hour) • WWTP Phase II ( 250 - 500 m /hour ) • WWTP Phase III (500 - 1.000 m /hour)