15 — NEWCASTLE CENTRE DELIVERY
CONSTRUCTION PROCESS
The construction process for the Newcastle Centre, in accordance with best practice,
comprises various phases, each phase relating to the next, as below and included in
Appendix 6.
BUILDING DESCRIPTION
The Newcastle Centre will be based on a modular steel frame construction concept with
insulated cladding and glass to the facades. Internally, the design includes cantilevered
driving range bays with concrete floors. The internal walls are jumbo stud partitioning
with limited suspended ceilings where necessary. Completing the design is the fully
fenced driving range approximately 215mtrs X 110mtrs and car park spaces to
accommodate some 150 vehicles.
CONCEPT DESIGN & APPROVAL
The concept design is drawn in part from the exciting Bigshots facilities in the United
States and other centres, providing full driving range, Food & Beverage facility, along with
car parking and floodlighting for evening use. With their appointment, Nicholson Nairn
Architects, following input from all parties have developed detailed drawings
incorporating all aspects of the Newcastle Centre requirements.