Solar project's innovative For their part, the operators —
prepaid billing system ANTECO and OREEI — have
increased efciencies in meter
However difcult, logistical challenges r e a d i n g , b i l l i n g , c o l l e c t i o n ,
involving the project's construction disconnection, and reconnection as a
paid off. After all, the Malalison Island result of digitization of the system.
project offered several innovations that
distinguished itself from other solar As a result of this prepaid system, the
energy projects. investors are assured a return on
investment because the services are
completely paid as soon as they are
One such innovation is its prepaid
billing system that positively impacts all delivered.
three types of stakeholders: the
Increasing solar PV use cuts
consumer, the operator, and the
investor. diesel consumption
The consumer, which mostly
Operation of the hybrid solar PV power
comprises households on the island, plant began on December 2018, with
have full control of energy use because solar production at around 135.40
of the prepaid system. The system also
kWh and genset production at around
prevents monthly payments which can 335.65 kWh. During the start up
be a burden if income is insufcient. phase, more power was generated by
the genset.
The prepaid billing system is
connected to their mobile phones, However, the next three months
making it very convenient to pay for painted a different picture. Around
their bills. Subscribers receive an SMS 1307.55 kWh was generated for genset
every 5PM documenting their energy production while around 1973.20 kWh
consumption. This was done in for solar production for the month of
partnership with Smart as the January. The energy generation trend
telecommunications network provider. is shifting towards the use of the solar
31