Ways Forward: Information and             Looking  forward,  some  legislative
                   legislation are key to accelerate         measures on the pipeline could bring
                   RE development and energy                 in  positive  change  in  easing  entry  of
                   democratization                           energy  industry  players  –  such  as
                                                             Senate Bill No. 175 or the Microgrid
                                                             Systems  Act,  and  Department  of
                   Assess  the  implementing  rules  and     Energy  Circular  for  a  national  smart
                   regulations  before  entering  into  any
                                                             grid policy framework. Hopefully, these
                   business – this is the recommendation
                                                             d e v e l o p m e n t s   l e a d   t o w a r d s
                   of OREEI president Mr. Erel Narida to     democratizing  energy  for  the
                   those who wish to do a similar micro-     underserved in all islands, whether big
                   grid  project  in  the  future.  There  are   or small, in the Philippines
                   considerations  in  pursuing  projects
                   similar  to  the  hybrid  solar  PV  pilot   References:
                   plant.  These  include  surveying  the
                   market,  building  the  technology,       ANTECO-OREEI Power Inc. (n.d.) Case
                   preparing  for  any  nancial  costs  and   Report: Malalison Solar Hybrid Mini Grid
                   assessing any regulatory provisions.      [PowerPoint slides].
                                                             ANTECO (2018). Malalison Island Hybrid
                   Often,  others  would  think  that        Solar  Mini-Grid  [PowerPoint  slides].
                   technology would be the most difcult     R e t r i e v e d   f ro m   h t t p s : / / w w w. e u -
                   part. However, this may not be the case   asep.ph/wp-content/uploads/2018/10/2.-
                   at present because of increased access    ANTECO.pdf.
                   to a wealth of data – the most important   Asian  Development  Bank  (2019).  “Pilot
                   factor, as this provides an indication on   Project  Brings  24-Hour  Solar  Power  to
                   the  future  and  sustainability  of  the   Improve Life on Small Philippine Island”.
                   project.  For  example,  the  pilot  solar   N e w s   R e l e a s e s .   R e t r i e v e d   f ro m
                   power plant is now entirely owned by      https://www.adb.org/news/pilot-project-
                   ANTECO  in  accordance  with  the         brings-24-hour-solar-power-improve-life-
                   current regulatory rules on ownership.    small-philippine-island.