Page 18 - NorthAmOil Week 29
P. 18

NorthAmOil                                  NEWS IN BRIEF                                         NorthAmOil







       but was initially only granted one more year,   LNG chief executive, Jonathan Cook. “The   CleanDesign’s hybrid energy management
       until September 2020, to complete the project.  proposed Galveston LNG Bunker Port would   and battery power system optimizes power
         The company requested a second one-  provide the necessary infrastructure to supply   generation on drilling rigs. The drilling rig
       year extension in June 2020, and was granted   the growing market for LNG marine fuel,   setup consists of existing generators and the
       it on July 15. However, even before taking   substantially reducing marine emissions and   CleanDesign hybrid power upgrade. Together,
       into account the impact of the coronavirus   cutting shippers’ fuel costs at the same time,”   the system reduces fuel consumption, lowers
       (COVID-19) pandemic, Delfin was running   Cook added.                    emissions, shortens genset runtime hours, and
       behind schedule, having previously been   The facility infrastructure will be   cuts power-related downtime on the drilling
       targeting a final investment decision (FID) in   designed around floating liquefaction   rig.
       2020 and start-up in mid-2024.      (FLNG) technology to be engineered, and   “LAVLE offers an industry leading battery
         The FLNG project would use existing   constructed by Pilot partner, Wison Offshore   solution for safety. This includes cell level
       offshore pipelines to supply gas to up to four   & Marine. “Wison is pleased to be part of this   thermal isolation to prevent the risk of
       vessels that could produce up to 13mn tonnes   breakthrough US project by designing and   thermal runaway, a critical feature to mitigate
       per year (tpy) of LNG or 1.7bn cubic feet per   building the liquefaction unit, that will supply   the risk of battery fires. The technical teams at
       day of natural gas.                 LNG to the end-user market in the Galveston,   LAVLE and CleanDesign have also worked in
                                           Houston and Texas City port complex”, stated   great detail to tailor the battery performance
                                           Vivian Li, head of Wison Offshore & Marine   to the power and energy requirements of
       Pilot LNG announces                 in North America. “Since delivering the   drilling at maximum rates of penetration,”
                                           world’s first FLNG facility currently operating
                                                                                said Joel Donen, CEO of CleanDesign. “We
       Galveston LNG Bunker Port           in Argentina, Wison has developed numerous   are pleased to announce the selection of the
                                                                                LAVLE battery solution and believe it will
                                           floating solutions across the LNG value
       project to provide clean-           chain, with a focus on promoting a cleaner   add value to the oil and gas industry as well
                                                                                as support the industry’s commitment and
                                           energy infrastructure alternative to the global
       burning LNG marine fuel to          market.”                             efforts around environmental, social, and
                                                                                governance (ESG) goals.”
                                           PILOT LNG, July 16, 2020
       ports of Houston, Texas City                                             power systems, CleanDesign is an exciting
                                                                                  “As the world leader in hybrid drilling rig
       and Galveston                       SERVICES                             partner to work with on this project, and we
                                                                                look forward to contributing our advanced
       Pilot LNG, a clean energy solutions company   CleanDesign selects LAVLE   ESS technologies to its state-of-the-art
       focused on providing infrastructure solutions                            system,” said Dr. Jason Nye, CEO, LAVLE.
       to supply new markets with clean-burning   Proteus Energy storage        “These advanced hybrid drill rig power
       natural gas, announced today the filing of its                           systems will make a meaningful impact in
       regulatory applications paving the way for the   system for oil and gas   reducing the costs and carbon emissions
       development of the region’s first dedicated                              related to drilling rig operations and we are
       LNG bunker terminal, Galveston LNG   hybrid power application            proud to be part of this solution.”
       Bunker Port, to be located on Pelican Island.                              The first LAVLE Proteus ESS will be
       The company expects a final investment   LAVLE today announced that CleanDesign   delivered in Fall 2020 as part of CleanDesign’s
       decision on the project in the second half of   Power Systems has selected the LAVLE   global rollout of its technology to industry
       2021 and operations starting in 2024.  Proteus Lithium-Ion Battery Energy Storage   leading drilling rig contractors and oil and gas
         “Pilot LNG’s Galveston LNG Bunker Port   System (Proteus ESS) for inclusion in its   operators.
       will provide clean-burning LNG to one of   hybrid power management system for drilling   LAVLE, July 18, 2020
       the US’s largest Port complexes,” said Pilot   rigs in the oil and gas industry.






























       P18                                      www. NEWSBASE .com                           Week 29   23•July•2020
   13   14   15   16   17   18   19