Page 14 - LatAmOil Week 37 2022
P. 14

LatAmOil                                     NEWS IN BRIEF                                          LatAmOil










       INVESTMENT
       GeoPark announces

       intent to fully redeem

       senior notes due 2024

       GeoPark, a leading independent Latin American
       oil and gas explorer, operator and consolidator,
       today announced its intent to fully redeem the
       aggregate principal amount of its 6.500% senior
       notes due 2024, which will equal $67.124mn as
       of the anticipated redemption date.
         A notice of redemption will be sent to the
       holders of the Notes in accordance with the
       requirements of the indenture governing the
       Notes. Pursuant to the terms of the Indenture,
       the Notes will be redeemed at a redemption  Field, where some minor surface tie-in lines have  objective of siting and drilling a first horizontal
       price equal to 101.625% of the principal amount  been cleaned by removing internal paraffins and  well within the VEA.
       of the Notes redeemed, plus accrued and unpaid  asphaltenes. In the Llanos area, Vikingo produc-  On the CPO-11 Block, outside of the VEA,
       interest and additional amounts (if any) to, but  tion flows remained stable following its natural  Hupecol Meta has targeted drilling, by year-end,
       excluding, the redemption date.     depletion rate. The exploration campaign in  the Caonabo well with the participation of Parex
         The anticipated redemption date is Septem-  Altair and LLA-47 blocks remains on hold and  Resources.
       ber 21, 2022.                       pending approval from local authorities. Con-  Houston American owns an 11% interest in
       GeoPark, September 7 2022           versations with the ANH concerning the formal  each of the wells in the Venus Exploration Area
                                           approval process are ongoing.        and will own a 5.5% interest in each of the wells
                                              Interoil Exploration and Production ASA is  on the balance of the CPO-11 Block.
       PERFORMANCE                         a Norwegian based exploration and production   John Terwilliger, CEO of Houston Ameri-
                                           company, listed on the Oslo Stock Exchange with  can, stated: “We are pleased to have commenced
       Interoil issues production          a focus on Latin America. The Company is oper-  operations on the CPO-11 Block and the pro-
                                           ator and license holder of several production and  gress to date and look forward to further devel-
       report for August 2022              exploration assets in Colombia and Argentina  opment of the Venus Exploration Area and
                                                                                larger block.”
                                           with headquarters in Oslo.
       Colombia, operated: August 2022 (966 boepd,   Interoil, September 12 2022  About Houston American Energy Corp.:
       615 bpd of oil); July 2022 (951 boepd, 610 bpd                           Based in Houston, Texas, Houston American
       of oil).                            Houston American Energy              Energy Corp. is a publicly-traded independent
         Argentina, operated by Salva Maria Oil on                              energy company with interests in oil and natural
       behalf of IOX until local authorities approve   provides update on       gas wells, minerals and prospects. The Compa-
       operator’s licence: August 2022 (2,161 boepd,                            ny’s business strategy includes a property mix
       368 bpd of oil); July 2022 (2,224 boepd, 423 bpd   operations in Colombia  of producing and non-producing assets with
       of oil).                                                                 a focus on the Delaware Basin in Texas and
         Comments: In August 2022, the average daily  Houston American Energy Corp. today pro-  Colombia.
       operated production from fields in Argentina  vided an update with respect to 2022 opera-  Houston American Energy Corp., August 30 2022
       and Colombia combined decreased by 48 boepd  tions and near-term plans on the CPO-11 Block
       representing a decline of less than 2% compared  in Colombia. Houston American’s interest in   Enauta says Atlanta field
       with July. This is explained by some operational  the CPO-11 Block, and wells thereon, is held
       changes in Argentina, especially in the Santa  through our ownership interest in Hupecol Meta   has resumed production
       Cruz operation.                     LLC.
         In Argentina, a slight decrease in production   Year-to-date, two wells have been drilled on  Enauta Participações informs its shareholders
       rate was recorded in the Santa Cruz fields, where  the CPO-11 Block, both located in the Venus  and the market in general that, following the
       the Oceano Field accounted for most of it. This is  Exploration Area (VEA). The Bugalo #1 well was  material fact released on August 26, 2022, the
       due to an ongoing gas compressor enhancement  drilled and is awaiting testing. The Saturno #1  Atlanta Field resumed its production through
       project which involves replacing its gas fuelled  well was drilled, plugged back and side-tracked  well 7-ATL-2HP-RJS. The second well should
       engine with an electrical one, and which means  resulting in the Saturno #1ST well. The Saturno  start operating next and, by the end of Septem-
       that Interoil will benefit from connecting to a  #1ST well is expected to begin production in the  ber, the resumption of production from the third
       new power generation unit already working in  very near future. A formerly shut-in well in the  well in the Field is expected. During this month,
       the Oceano Field. This field work is expected to  VEA, the Venus 2A, is planned to be returned to  the commissioning of the new water treatment
       last to the last week of September.  production shortly.                 unit with increased capacity will be carried out
         In Colombia, Puli C production increased   Hupecol is planning to acquire a 3D seismic  and the stabilisation of production in Atlanta
       from the previous month, especially in the Mana  grid covering a portion of the VEA with the  will take place.



       P14                                      www. NEWSBASE .com                      Week 37   14•September•2022
   9   10   11   12   13   14   15   16   17   18