Page 15 - Aerial Appliance Operator Lesson Plan V2
P. 15

13


              Topic 6: Siting theory






              Training aim


              To ensure students understand:

              • the siting considerations of an operator of the appliance

              • the ground condition considerations for siting appliance

              • the requirements when siting appliance on a gradient

              • obstructions to be considered when siting the appliance

              • positioning considerations when siting the appliance

              • maximum wind speed allowed for safe operation of the appliance.

              Resources


              • training room

              • student resources




                      CONTENT TO COVER



              Recap


              Recap main points from previous session.


              Siting responsibilities


              Cover the following:

              • The Incident Controller (IC) will have the responsibility as to when
                 and where an aerial will be used.

              • The OIC of the aerial has the responsibility to sight the aerial within
                 its operating range for the objectives given.