                  The cost of the Eco-Solution will be further reduced after removing the item 11 website and hosting cost (1 time cost) and
                  using bulk purchase quantities procurement.


            Potential carbon and cost savings for Singapore      Conclusion
            In Singapore, there are many air conditioning companies. If  The ESI team is very grateful that the BMS engineering team
            the eco-solution is applied to all air conditioning companies  provided a lot of advice and shared their experience towards
            in  Singapore,  the  potential  carbon  saving  is  estimated  at  the development of the eco solution. BMS shared invaluable
            641,401,736 kgCO2 or 641,401 Tons CO2. The potential of this  insights  and  company  proprietary  technical  information,
            eco-solution  is  enormous.  Government  agencies  (i.e.  NEA,  which only BMS partners would be able to access. By imple-
            SCDF)  can  work  with  air  conditioner  companies  to  bundle  menting the eco solution, BMS aims to reduce their product
            SRD  together  with  air  conditioner  sales.  The  cost  of  SRD  carbon emissions of 12,459,837 kgCO2 or 12,459 tons CO2
            can be reduced through bulk production and procurement.  and  energy  saving  of  24,501,895.2  kWh.  This  will  enhance
            To further reduce the installation cost, the government can  their  brand  reputation  and  environmental  sustainability.  If
            provide subsidies for the SRD with every new air conditioner  this eco solution is adopted nationwide, the potential carbon
            purchased. Essentially, NEA can achieve its goal of lowering  savings will be exponential.
            refrigerant leakage, and SCDF can mitigate fire risk from R32
            refrigerant.                                         While the ESI team fabricates the SRD prototype's mechanical
                                                                 parts, some electronic, PCB and microprocessor components
                                                                 are done by an engaged external vendor. The ESI team needs
                                                                 to  convey  their  requirements  and  design  to  the  vendor  to
                                                                 transform their idea into the actual functioning product. The