Engineering in DC:





      Life Cycle Post





      Construction








      Clint Summers, P.E., Senior Director, Power Engineering
      Joe Dietrich, P.E., Director of Analytics




                 any are familiar with the role Engineering has in   Some of the functions engineering plays in the fit-out process



                 designing and constructing a new data center   include power distribution layouts for STSs, PDUs, and


                                                              RPPs, creating striping plans, coordinating with overhead or
     M in our day-to-day work as design builders.             underfloor utilities, designing cable tray solutions for power






      But how many know the role Engineering plays in the     and/or IT distribution, coordinating with hot/cold aisle
                                                              containment, lighting design, power distribution busway design,



      post-construction life cycle of a data center facility?  modifications to the base building short circuit/coordination/




                                                              arc flash studies, grounding distribution designs, and more.

      In the chronology of a data center facility, tenant fit-outs are one



      of the first requests for engineering support after a facility is built.   Once the data center has been fit-out for its tenant or tenants, the


      Many of the data centers Rosendin builds are colocation facilities   process of day-to-day operations begins. Rosendin Engineering has a


      or "colos." These data centers lease out space to a tenant and   team of engineers called Field Engineering Leads (FELs) specializing
      provide power cooling and IT connectivity for other businesses to   in this type of work. FELs are utilized both during the final stages




      utilize by housing servers and other digital computing equipment.   of initial facility construction for First Time Energizations (FTEs) as





                                                              well as during special owner operations exercises (long after initial


      Part of the process of getting data centers up and running   facility energization) to create Step-By-Step (SBS) procedures.



      in a way where the owner is generating profits is the tenant


      fit-out process. Engineering works closely with both the   This service provides the operations teams with the appropriate


      data center owner and the tenant during this process,   processes of switching, testing, observations, data gathering,


      and together, the team customizes the leased space to   modifications, etc., to complete specialized work. This documented





      provide maximum function and efficiency for the tenant.   process is often called a Method of Procedure (MOP).