Page 91 - MRF Training TJ MRF Manual Version 5 22042024 final April 24_Neat
P. 91

Operating a Telescopic Forklift

                    Operative will be externally trained and competent and have read
                   the RA’s and SSW’s relevant to the job they are undertaking.
                    Read  and  understood  the  operators  handbook  relevant  to  the
                   equipment they are operating.
                    Staff will wear all the necessary PPE provided and instructed.

                    Follow all safety instructions given and not put themselves at risk.
                    Ensure that they make eye contact before entering the danger
                   zone of any machine or vehicle within the working environment.

            Daily Checks


            Basic Start Up Procedure




                Complete a daily walk around safety inspection   Windows and mirrors must be adjusted and
                of your machine that will include checking fluid   clean at all times.  Inspect the bucket or grab before use.   Check your blind spots using 1 m rule
                 levels before completing a defect sheet-any         Ensure that it is fitted correctly prior to start up   and continue to start up procedure
                 defects should be reported to your manager   The reversing camera and bleeper must be   and all locking pin are fitted corectly
                     and rectified as necessary.  operational at all times







                   Ensure that your seatbelt is   Start engine on slow idle for 2           Before starting the engine,
                      worn at all times.  minutes before full power is   Confirm that all levers and pedals   ensure the handbrake is applied
                                                                                            and all bystanders are a safe
                                                                       are in neutral
                        Start Work              engaged.                                        distance away.




            Basic Shut Down Procedure






                                                                                                 Climb down from
              Park machine in                                                                    the machine using
                                                          Allow the
                                                                                     Switch off
                              Lower the
                a safe area   bucket, grab or   Return all   engine to idle   Apply the   Engine, remove   three points of
                away from     forks to the   control levers to   for 2 minutes to   handbrake  keys and lock   contact whilst
               waste on a firm   ground      neutral    cool the engine             the machine.  using the handrails
                level surface                                                                       and steps
                                                                                                    provided.







                                                   Page 90 of 181

                                                                                  Reviewed April 2024
   86   87   88   89   90   91   92   93   94   95   96