Page 94 - MRF Training TJ MRF Manual Version 5 22042024 final April 24_Neat
P. 94

Operating a Loading Shovel

                    Operative  will  be  externally  trained  and
                    competent  and  have  read  the  RA’s  and
                    SSW’s  relevant  to  the  job  they  are
                    undertaking.

                    Read  and  understood  the  operators
                    handbook.

                    Staff  will  wear  all  the  necessary  PPE
                    provided and instructed.
                    Follow all safety instructions given and not
                    put themselves at risk.
                    Ensure that they make eye contact before
                    entering the danger zone of any machine
                    or vehicle within the working environment.

            Daily Checks





             Complete a daily walk around safety inspection   Windows and mirrors must be adjusted and
             of your machine that will include checking fluid   clean at all times.  Inspect the bucket or grab before use.   Check your blind spots using 1 m rule
              levels before completing a defect sheet-any        Ensure that it is fitted correctly prior to start up
              defects should be reported to your manager   The reversing camera and bleeper must be   and all locking pin are fitted corectly  and continue to start up procedure
                  and rectified as necessary.  operational at all times


                         Basic Start Up Procedure



                                                                                        Before starting the engine,
              Ensure that your seatbelt is   Start engine on slow idle for 2   Confirm that all levers and pedals   ensure the handbrake is applied
                 worn at all times.  minutes before full power is   are in neutral     and all bystanders are a safe
                                           engaged.
                    Start Work                                                             distance away.





            Basic Shut Down Procedure



                                                                                                Climb down from
              Park machine in                            Allow the                              the machine using
                                                                                    Switch off
                             Lower the
               a safe area   bucket, grab or   Return all   engine to idle        Engine, remove   three points of
                                                                       Apply the
               away from     forks to the   control levers to   for 2 minutes to   handbrake  keys and lock   contact whilst
              waste on a firm   ground      neutral    cool the engine             the machine.  using the handrails
               level surface                             and turbo.                                and steps
                                                                                                   provided.





                                                   Page 93 of 181

                                                                                  Reviewed April 2024
   89   90   91   92   93   94   95   96   97   98   99