Page 75 - CompleteBooklet2021
P. 75

iii.   Provision of Exhaust system at Fuel Injectors & pumps overhauling
                          Room















                                      Provided exhaust system at FIP Room




                          During  the  overhauling  of Fuel injectors and pumps fumes of HSD oil are generated
            which  are  harmful,  if  inhaled.  An  exhaust  system  was  designed  and  fabricated for expelling
            these  fumes  at  a  cost  of  INR  32,000/- enabling the staff to work in a fume-free environment
            apart from improvement  in fire safety.


                    iv.   Inauguration  of  Electric  Steam  Boiler:  PCEE/SCR inaugurated the Electric
                          Steam  Boiler  of  20KW  capacity  with  a storage capacity of 25 litres and rated
                                                2
                          pressure  of  6  kg/cm  and also witnessed the blowing of radiators on loco with
                          generated steam.

















                     v.   Inauguration of the Indigenously developed Radiator in-situ cleaning and
                          testing  equipment:  PCEE/SCR  inaugurated  the  indigenously  developed
                          Radiator  in-situ  cleaning  and testing equipment which was developed in-house
                          by  the  shed  staff  for  in-situ  internal  cleaning  of  the  Radiator  cores  of  the
                          locomotives.
















                                                            72
   70   71   72   73   74   75   76   77   78   79   80