Page 44 - Induction & WorkBook
P. 44

ELECTRICAL SYSTEMS


                                                SUMMARY OF CONTROL MEASURES:-



                                                ●      Only use suitably competent and pre-
                                                       qualified electrical contractors;


                                                ●      Must have suitably qualified supervisor;

                                                ●      A Permit-to-Work on Electrical Systems is

                                                       required and must be complied with;


                                                ●      No live working except in exceptional
                                                       conditions such as fault finding and
                                                       commissioning, but only under stricter

                                                       controls;

                                                ●      All work must be suitably planned and  task

                                                       coordinated with relevant parties;


                                                ●      Contractor/employee must provide suitable
                                                       and sufficient, task specific Risk

                                                       Assessments and Method Statement for the
                                                       task;


                                                ●      Electrical systems must be isolated and
                                                       locked off.


                                                ●      Check and verify the correct electrical
                                                       systems are isolated before removing

                                                       guards or working on electrical systems;

                                                ●      Provide and use suitable insulated matting

                                                       to BS 61111: 2009;


                                                ●      Electrical panels must be kept secure unless
                                                       working on them;


                                                ●      All tools shall be double insulated to BS
                                                       60900;


                                                ●      Use calibrated an certified electrical testing
                                                       equipment;


                                                            38
   39   40   41   42   43   44   45   46   47   48   49