Page 50 - Best Practice for Construction Projects
P. 50
Cable management
• Ensure all cables are in good
condition, free from damage and PAT
tested (quarterly) before use.
• All cables must be elevated off the
5. Housekeeping and Storage
ground when in use.
• Never overload sockets on site.
• Never trail cables through doorways or
over sharp edges.
• Secure all cables overhead eliminating
the risk of trip hazards, damage to
electric cables and electric shock.
2 Visual Standards | Feb. 2019