Page 8 - test
P. 8
Ref : CM-DFH4-2014-1
BEAZLEY Issue : 1
DFH 4 Series Spacecraft Date : 28 Sept 2014
Page 6 of 38
Figure 4.1-3 Projected DFH spacecraft evolution
The four spacecraft under consideration for this evaluation are categorized as DFH-4
4.2 SPACECRAFT UNDER CONSIDERATION FOR THIS ANALYSIS
Four spacecrafts are considered for this assessment:
1. Chinasat 9A DFH 4: Kick off 2014/04/01 Launch 2017/02/15 (35 months)
2. Chinasat 16 DFH 4S: Kick off 2013/05/30 Launch 2017/02/25 (43 months)
3. Chinasat 18 DFH 4E: Kick off TBD Launch 2017/06 (TBD months)
4. Laosat-1 DFH 4S: Kick off 2012/12/01 Launch 2015/11/15 (36 months)
This document is proprietary of BEAZLEY© and must be treated on a confidential basis. It may be used solely by BEAZLEY, use or reproduction, of the document and the
Contained therein, for any other purposes without BEAZLEY written consent is prohibited.