Page 8 - test
P. 8

Ref  : CM-DFH4-2014-1
                                                    BEAZLEY                   Issue : 1

                                               DFH 4 Series Spacecraft        Date : 28 Sept 2014
                                                                                                 Page 6 of 38














































                                         Figure 4.1-3 Projected DFH spacecraft evolution


            The four spacecraft under consideration for this evaluation are categorized as DFH-4






            4.2 SPACECRAFT UNDER CONSIDERATION FOR THIS ANALYSIS

            Four spacecrafts are considered for this assessment:
               1.  Chinasat 9A DFH 4: Kick off 2014/04/01 Launch 2017/02/15 (35 months)
               2.  Chinasat 16 DFH 4S: Kick off 2013/05/30 Launch 2017/02/25 (43 months)
               3.  Chinasat 18 DFH 4E: Kick off TBD Launch 2017/06  (TBD months)
               4.  Laosat-1 DFH 4S: Kick off 2012/12/01 Launch 2015/11/15 (36 months)
















             This document is proprietary of BEAZLEY© and must be treated on a confidential basis. It may be used solely by BEAZLEY, use or reproduction, of the document and the
                                  Contained therein, for any other purposes without BEAZLEY written consent is prohibited.
   3   4   5   6   7   8   9   10   11   12   13