Page 1128 - Workshop Manual - Aumark (BJ1051)
P. 1128

51-36
                                              Heater and AC-Refrigerant oil


          Replace

          1.     Exhaust the refrigerant
          (a).    Turn on the AC switch.
          (b).    Run the engine 5 to 6 minutes at 1000rmp  to make the refrigerant flow; and collect the
                 refrigerant oil in every part to compressor as possible.
          (c).    Stop the engine.
                                                           (d)     Reclaim the refrigerant.
                                                           Hint:
                                                           Do not exhaust the refrigerant into air because it
                                                           will pollute the environment.






                                                           2.     Evacuate to vacuum
                                                           (a).    Connect dual manifold pressure meter,
                                                                  refrigerant filling pipe and vacuum pump
                                                                  together and evacuate to vacuum.
                                                           (b).    First open the high pressure and low
                                                                  pressure valves of the pressure meter,
                                                                  then open the valve of vacuum pump (if
                                                                  there is) when the evacuation begins.
                                                           (c).    Turn the switch of vacuum pump to ON
   51
                                                                  position and evacuate more than 20m;
                                                                  turn off high/low pressure valves of the
                                                                  pressure meter and the switch of vacuum
                                                                  to stop vacuum pump when the pressure
                                                                  displayed on the meter reaches to or near
                                                                  to -760mmHg.


          3.     Air tightness inspection
          (a).    Notes the reading of pressure meter and check the pressure inside of the circuit 5 minutes
                 after vacuum pump is stopped; continue the next step when it is confirmed that the reading
                 is not changed. Repair the leak and then evacuate if the pressure increases (the speed of
                 increase is related with the scale of leak).















                                                                                                        Page 1128
   1123   1124   1125   1126   1127   1128   1129   1130   1131   1132   1133